Construction of Gelephu - Tareythang roads and bridges on Southern East-West Highway; Package-II; from Ch 3868.0 to 8453.0m

World Bank -- Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project · Bhutan government procurement

Closed September 07, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

Specific Procurement Notice

Invitation for Prequalification

Country: Kingdom of Bhutan

Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (Access) – Bhutan Project

Contract Title: Construction of Gelephu-Tareythang Road and Bridges

Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant)

Prequalification Reference No: ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3

1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project, and intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1, ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and Bridges.

2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang.

The contract packages are described below:

i. Package I: Segment 1 to 5 (km 0.000 to km 3.868)
Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and associated ancillary works. The package also includes construction of the following two major bridges:

• Gelephu Bridge – PSC I-Girder Bridge of span configuration (2 × 40 m); and
• Mau River Bridge – Cast-in-Situ Balanced Cantilever Bridge of span configuration (4 × 60 m) + 2(60 + 2 × 90 + 60) + (3 × 60 m), including associated...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project
CountryBhutan
CategoryBuilding Construction
PublishedJuly 17, 2026
Procurement stageRequest for Proposal (RFP)
ClosedSeptember 07, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedOctober 06, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

See every Bhutan Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Bhutan Building Construction intelligence report in your inbox

A personalized report on Bhutan Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.