Supply, Installation, and Commissioning of Last-Mile Connectivity Infrastructure and Local Area Network (LAN)

World Bank -- Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project · Bhutan government procurement

Bidding on World Bank-funded work in Bhutan? Get new Bhutan tenders by email, free: Set up alerts

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

November 06, 2026
Response Due
Active
Status

Opportunity Overview

GovTech/ACCESS/PMU/2025-26/ September 24, 2026

Specific Procurement Notice

Request for Bids

Goods

(Two-Envelope Bidding Process)

Country: Bhutan

Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 – Bhutan Project

Contract Title: Supply, Installation, and Commissioning of Last-Mile Connectivity Infrastructure and Local Area Network (LAN)

Loan No/Credit No/ Grant No: IDA Credit No. 7756-BT and IDA Grant No. E431-BT

RFB Reference No.: ACCESS/GOVTECH/GD-2

1. The Royal Government of Bhutan (hereinafter called “Borrower”) has received financing from the World Bank toward the cost of the Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 – Bhutan Project, and intends to apply part of the proceeds toward payments under the contracts for Supply, Installation, and Commissioning of Last-Mile Connectivity Infrastructure and Local Area Network (LAN).

2. The Government Technology (GovTech) Agency, Royal Government of Bhutan (“GovTech”) now invites sealed Bids from eligible Bidders for Supply, Installation, and Commissioning of Last-Mile Connectivity Infrastructure and Local Area Network (LAN) described in the List of Goods and Delivery Schedule:

(a) Lot-1: Supply, Installation, and Commissioning of New Anti-Rodent Fiber (80km for 25 sites) and Replacement of ADSS Fiber (119.5km for 101 sites) with Anti-Rodent Fiber.

(b) Lot-2: Supply, Installation and Commissioning of Last-Mile Connectivity Infrastructure and New Local Area Networks for 25 Agencies, and Enhancement of Existing Local Area Networks for 32 Agencies.

3. Bidders may submit Bids for one or both Lots, as further specified in the Bidding Document. Discounts conditional upon the award of more than one Lot shall not be considered in the evaluation of Bids.

4. Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” dated...

Want more tenders like this one?

We will email you a free list of open tenders in Bhutan, usually within 10 minutes. No account needed.

Tenders like this are published on a national procurement portal that most bidders outside Bhutan never check.

How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.

Bidding on this? Book 15 minutes with us and we will pull the documents, past awards and a translation for this tender live with you. Book a walkthrough

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, cancel anytime.

Start a free GlobalGov account

Solicitation Details

Issuing agencyWorld Bank -- Accelerating Transport and Trade Connectivity in Eastern South Asia Phase 2 - Bhutan Project
CountryBhutan
CategoryTechnology
PublishedSeptember 24, 2026
Procurement stageRequest for Proposal (RFP)
Response dueNovember 06, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedOctober 23, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Related Opportunities in Bhutan

Supply of International Internet Bandwidth for the Government Networks under the Indefeasible Rights of Use (IRU) approach.
Maintenance of road through Piloting of Performance Based Maintenance Contract (PBMC) of Wangdue Zam to Chuserbu (76.3Km) and Lawala to Phobjikha (17.24Km)
Selection of NCS for carrying out Exploratory Core Drilling and Associated Tests for Chamkharchhu II Hydropower Project and Chamkharchhu IV Hydropower Project
Construction of Sanitary and Phydosanitary Service (SPS) Centre at Phuentsholing

See every Bhutan Technology opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →