Design, Supply, Installation, and Commissioning of 45MW/180MWh Battery Energy Storage Systems (BESS) including Associated Civil Works and Initial Operations and Maintenance

World Bank -- Belize Reliant and Resilient Energy System Project · Belize government procurement

Bidding on World Bank-funded work in Belize? Get new Belize tenders by email, free: Set up alerts

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

November 23, 2026
Response Due
Active
Status

Opportunity Overview

REQUEST FOR BIDS

(PLANT DESIGN, SUPPLY AND INSTALLATION)

Design, Supply, Installation, Testing, Commissioning and 3-Year Operations & Maintenance of Four (4) Grid-Scale Battery Energy Storage Systems

Institution: Government of Belize through the Ministry of Finance

Country: Belize

Project: Belize Reliant and Resilient Energy Systems (BRRES) Project

Process ID: BZ-MFEDI - CEU-539302-CW-RFB

Bid Submission Deadline: November 23, 2026; 3:00 p.m. (Local Belize Time)

The Government of Belize has received financing from the World Bank toward the cost of the BRRES Project and intends to apply part of the proceeds toward payments under the Contract for the Design, Supply, Installation, Testing, Commissioning, and 3-Year Operations & Maintenance of Four Independent Battery Energy Storage Systems at Belize Electricity Ltd. substation sites in Westlake, Belize District; Dangriga, Stann Creek District; Buena Vista, Corozal District; and San Pedro, Ambergris Caye. This will strengthen the country’s electricity infrastructure through the integration of 40 MW of battery energy storage. This investment will support the future adoption of renewable energy, enhance grid resilience to extreme weather events, and provide technical assistance for system optimization.

The Government of Belize now invites sealed Bids from eligible Bidders for the complete turnkey design, supply, installation, testing, commissioning, and 3-year O&M of four grid-forming/grid-following BESS facilities with the following minimum capacities:

• Westlake (10.8 MW / 43.2 MWh, 22 kV interconnection);
• Dangriga (10.8 MW / 43.2 MWh, 22 kV interconnection);
• Buena Vista (10.8 MW / 43.2 MWh, 34.5 kV interconnection);
• San Pedro (12.7 MW / 50.8 MWh, 34.5 kV interconnection).

Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” (Fifth Edition, September 2023) (“Procurement...

Want more tenders like this one?

We will email you a free list of open tenders in Belize, usually within 10 minutes. No account needed.

How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.

Bidding on this? Book 15 minutes with us and we will pull the documents, past awards and a translation for this tender live with you. Book a walkthrough

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, cancel anytime.

Start a free GlobalGov account

Solicitation Details

Issuing agencyWorld Bank -- Belize Reliant and Resilient Energy System Project
CountryBelize
CategoryConstruction
PublishedSeptember 24, 2026
Procurement stageRequest for Proposal (RFP)
Response dueNovember 23, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedOctober 23, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Related Opportunities in Belize

Consultancy services to develop a National Land Use Plan for Belize.

See every Belize Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →