Opportunity Overview
Invitation for Bids (IFB)
Project: Greater Accra Resilient and Integrated Development Project
Contract title: Reconstruction of Abbosey Okai Bridge
Country: Ghana
Credit No.: IDA-64100
RFB No: GH-MWH-219663-CW-RFB
Issued on: October 14, 2026
• The Government of Ghana has received financing from the World Bank toward the cost of the Greater Accra Resilient and Integrated Development Project and intends to apply part of the proceeds toward payments under the contract for Reconstruction of Abbosey Okai bridge. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing.
• The Ministry of Works, Housing and Water Resources invites sealed bids from eligible contractors for the Reconstruction of the Abbosey Okai Bridge. The project involves the demolition of the existing concrete arch bridge, approximately 47.5m long and 15.0m wide, which currently spans over the Odaw River. The existing structure is in a deteriorated condition, with visible concrete cover detachment, oxidized reinforcing steel bars, and vertical misalignment of the paving surface.
The new bridge structure to be constructed consists of a 47.5m single-span deck, made of COR-TEN steel beams and reinforced concrete slabs, supported by reinforced concrete abutments with pile foundations. The bridge will have sixteen HL 1100 M (S460) steel beams, spaced at 0.95m, with a reinforced concrete slab (C40/50) placed on top. The abutments will be 6.50m high, 16.20m long, and 2.20m thick, with 24 reinforced concrete piles (diameter 1.20m, depth 25m) ensuring structural stability.
The project also includes the elevation and reinstatement of the approach roads and surrounding areas affected by the bridge replacement. The existing vertical clearance of the bridge will be increased, preventing frequent submergence during floods. The bridge deck width...
Want more tenders like this one?
We will email you a free list of open tenders in Ghana, usually within 10 minutes. No account needed.
Tenders like this are published on a national procurement portal that most bidders outside Ghana never check.
How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.
Bidding on this? Book 15 minutes with us and we will pull the documents, past awards and a translation for this tender live with you. Book a walkthrough
Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, cancel anytime.
Start a free GlobalGov accountSolicitation Details
| Issuing agency | World Bank -- Greater Accra Resilient and Integrated Development Project |
|---|---|
| Country | Ghana |
| Category | Construction |
| Published | October 07, 2026 |
| Procurement stage | Request for Proposal (RFP) |
| Response due | November 17, 2026 |
| Status | Open — accepting responses |
| Official source | View original notice |
| Last verified | October 23, 2026 |
Source: The World Bank — Open Data, licensed CC BY 4.0.
Related Opportunities in Ghana
See every Ghana Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Your 14-Day Free TrialFree 14-day trial · cancel anytime
See who is already competing here →