Hiring of Independent Consultant for preparation of Audit and Assessment Reports Group-1 (Gümenek Regulator, Almus Dam, Ataköy Dam, Omala Dam) TIMP2

World Bank -- Türkiye Second Irrigation Modernization and Water Efficiency Project · Turkiye government procurement

Bidding on World Bank-funded work in Turkiye? Get new Turkiye tenders by email, free: Set up alerts

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

November 04, 2026
Response Due
Active
Status

Opportunity Overview

Engagement of Independent Experts for the Preparation of Dam Safety Inspection and Evaluation Reports under TIMP2 – Group 1 (Gümenek Regulator, Almus Dam, Ataköy Dam, Omala Dam)
The Government of the Republic of Turkey has obtained a loan from the World Bank to finance the "Turkey Second Irrigation Modernization and Water Efficiency Project," which is to be implemented by the Ministry of Agriculture and Forestry. The objective of the Project under this loan is to ensure the provision of irrigation services and the distribution of water in a manner that enhances resilience against climate-related risks. The General Directorate of State Hydraulic Works (DS) intends to use a portion of the loan proceeds for payments related to individual consultancy services for "Group 1: Independent Inspection and Report Preparation for Dam Safety under TIMP2 (Gümenek Regulator, Almus Dam, Ataköy Dam, Omala Dam)."
The consultancy services covered by this announcement generally encompass the following:
1. Dam Safety Inspection and Assessment
2. Detailed Dam Safety Inspection
The work is scheduled to be completed within 110 calendar days from the site handover. A detailed "Terms of Reference" for the assignment is provided in the attachment. The announcement and Terms of Reference can be viewed at https://dsi.gov.tr/Sayfa/Detay/2130.
Expressions of Interest must be submitted in writing by the Consultant/Expert—either by hand, registered mail, e-mail, or courier—to the address below no later than 17:00 (local time) on November 4, 2026.
General Directorate of State Hydraulic Works (DS)
Department of Dams and HPPs, Tender Branch Directorate
Contact Persons: Mehdi DOAN
Hakan DA
Mustafa Kemal Mahallesi Anadolu Bulvar No:9 Çankaya/ANKARA
Tel: +90 312 4545520
Fax: +90 312 4545505
E-mail: mehdidogan@dsi.gov.tr
hakandag@dsi.gov.tr
Web page: http://www.dsi.gov.tr

Want more tenders like this one?

We will email you a free list of open tenders in Turkiye, usually within 10 minutes. No account needed.

Tenders like this are published on a national procurement portal that most bidders outside Turkiye never check.

How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.

Bidding on this? Book 15 minutes with us and we will pull the documents, past awards and a translation for this tender live with you. Book a walkthrough

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, cancel anytime.

Start a free GlobalGov account

Solicitation Details

Issuing agencyWorld Bank -- Türkiye Second Irrigation Modernization and Water Efficiency Project
CountryTurkiye
CategoryInfrastructure
PublishedOctober 14, 2026
Procurement stageSources Sought
Response dueNovember 04, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedOctober 23, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Related Opportunities in Turkiye

Consulting services for conducting energy audits, preparing detailed designs and technical specifications, and supervising the renovation works for buildings in Konya province (21 building blocks across 13 campuses, with a total area of 99,201.42 m²)
Preparation of Saltbush Seedlings for Shipment, Transport, Preparation of Planting Site, and Planting Operations
Dibektaşı (Lot 1), Gölköy (Lot 2) and Gürgentepe (Lot 3) Forest Management Chiefships – Construction of Flood Control Projects
Construction Works for Seismic Retrofitting and Energy Efficiency Renovation of Public Buildings in Kocaeli (3 Buildings at the TÜBİTAK Gebze Campus)
Procurement of a Trial Plot Harvester for R&D Activities within the Scope of the Tardip Project
Balıkesir Fire Brigade Disaster Management Vehicles Procurement Sub-Project
Construction Works for Seismic Retrofitting and Energy Efficiency Renovation of Public Buildings in İzmir (Dokuz Eylul University Atatürk's Principles and History of Turkish Revolution Institute and Izmir Institute of Technology Architecture C Block)
Procurement of Individual Consultancy Services for Project Implementation Support-Technical Expert (Information Technologies Specialist)

See every Turkiye Infrastructure opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →