Technical Support and Project Management Consultant

World Bank -- Improving Power System Resilience for European Power Grid Integration Project · Ukraine government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

August 26, 2026
Response Due
Active
Status

Opportunity Overview

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES FIRMS SELECTION) UKRAINE Project: 176114 Ukraine – Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in Ukrhydroenergo) IBRD Loan No. 9284-UA CTF Loan No. TF0B5994 Assignment Title: “Technical Support and Project Management Consultant” Reference No .  UHE-IPSR-ES   PJSC "Ukrhydroenergo"  has received financing from the World Bank toward the cost of the Project: 176114 Ukraine – Improving Power System Resilience for European Power Grid Integration (Installation of Hybrid Systems for Electricity Production in Ukrhydroenergo), and intends to apply part of the proceeds for consulting services. The consulting services (“the Services”) include comprehensive supervision and project management support to UHE for the implementation of contract for Design, Supply and Installation of Battery Energy Storage Systems (BESS) with Energy Management Systems (EMS) and Ancillary Equipment at Kyiv HPP / PSP, Kaniv, Kremenchuk and Seredniodniprovska Hydropower Plants, including related services (training of UHE staff). The Project envisages the installation of BESS and the creation of an energy management system (EMS) of a total capacity of 197 MW 2-h BESS across 4 abovementioned locations. Each location and project Site is to be tendered as a separate Lot ( meaning that each separate location might have their own separate contractor and their own separate contract with terms that might differ from the other) , but construction is to be carried out simultaneously. Potential participants should keep in mind that they might have to deal with up to 4 different contractors and their own specific contracts during the implementation of this project. The Contract(s) is foreseen to commence on 01/02/2027, for an estimated duration of: from Effective Date until Operational Acceptance (DSI schedule,...

This is one of 90 active Ukraine Energy opportunities most of your competitors will never see.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- Improving Power System Resilience for European Power Grid Integration Project
CountryUkraine
CategoryEnergy
PublishedJuly 29, 2026
Procurement stageSources Sought
Response dueAugust 26, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedAugust 12, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Related Opportunities in Ukraine

Сonsultancy service provision by Consultant (legal entity (consulting firm)) for the ESG (Environmental, Social, and Corporate Governance) focused Training and Workshops (Capacity Building on O&M and Safety)
Battery Energy Storage System (BESS)
Catering services for students at general secondary education institutions in the Peresypsky District of Odessa, code 55510000-8: Cafeteria services under DK 021:2015 of the Unified Procurement Vocabulary
Design and survey work for the project: “Reconstruction of a compressor station with the installation of an engineering protection system in the Kalush District of Ivano-Frankivsk Oblast” (Design and Working Documentation phases) (Construction work and routine maintenance)
Design and survey work for the project: “Reconstruction of a compressor station with the installation of an engineering protection system in the Poltava District of Poltava Oblast” (Design and Working Documentation phases) (Construction work and routine maintenance)
"Major repairs of an apartment building damaged as a result of the armed aggression of the Russian Federation at the address: Kyiv region, Buchansky district, Makariv settlement, 1 Proektna st." (Correction)
"Overhaul of the water supply system of the village of Kalynivske, Beryslav district, Kherson region" (Code DK 021:2015 – 45453000-7 Overhaul and restoration)
New construction of an anti-radiation shelter in the Oleksandrivka Lyceum named after T.G. Shevchenko at 244 Podziguna Generala St. in the village of Oleksandrivka, Voznesensky district, Mykolaiv region. Correction

See every Ukraine Energy opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Ukraine Energy intelligence report in your inbox

A personalized report on Ukraine Energy opportunities, emailed in 5-10 minutes. One per month, no account needed.