Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB

Fermilab - DoE Contractor · United States government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

November 17, 2026
Response Due
Active
Status

Opportunity Overview

This scope of work is to build an addition and renovate the Central Utility Building (CUB). The CUB supplies chilled water, hot water, low conductivity water, and makeup water to various lab buildings and systems. These systems serve both comfort cooling and heating needs, as well as process cooling and utility requirements. It is vital to Fermilab�s mission that CUB be revitalized and expanded, ensuring the ability to serve existing and future loads. The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein. The critical schedule constraint for construction of this project is Fermilab�s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window. This project includes the following milestones: Milestone 1 � Issuance of Notice to Proceed (NTP) to 30th December 2027. This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement. Milestone 2 � 3rd January 2028; This milestone marks the point where construction work may begin. Milestone 3 � 31st January 2029; AUP 1 CUB Extension complete. Milestone 4 � 29th June 2029; AUP 2 Existing CUB Upgrade complete. Milestone 5 � 28th September 2029; Completion of CUB- including all remedial work following removal of site trailers.

How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start a free GlobalGov account

Solicitation Details

Issuing agencyFermilab - DoE Contractor
CountryUnited States
CategoryGovernment Procurement
NAICS236210
PSCZ2EZ
PublishedSeptember 17, 2026
Procurement stageRequest for Proposal (RFP)
Response dueNovember 17, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedOctober 10, 2026

Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.

Related Opportunities in United States

Thermographic video camera for prototype thermal test monitoring
PIP-II SSRS AND LB650 VACUUM GAUGE AND READOUT
Housekeeping Services – Fermilab
PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION
LBNF/DUNE-US South Dakota Scaffolding Services
Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
Housekeeping Services – Fermilab
RRR300 Niobium Sheet, Rods and Discs

See every United States Government Procurement opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United States Government Procurement intelligence report in your inbox

A personalized report on United States Government Procurement opportunities, emailed in 5-10 minutes. One per month, no account needed.