What makes healthcare building different from other construction
Healthcare buildings are engineering projects with a clinical brief, and the brief drives the cost. Ventilation is the clearest example: operating theatres, isolation rooms and pharmacy clean rooms require specified air change rates and controlled pressure relationships between adjacent spaces, verified by testing before the space can be used. Medical gas pipelines are installed, purity-tested and certified under a regime of their own. Imaging suites need radiation shielding designed against a physicist's calculation. None of this is discretionary and none of it can be value-engineered out late.
Most of this work happens on a site that is already a working hospital, which converts a construction programme into a logistics problem. Possession is phased around clinical services that cannot stop, decanting wards in sequence; infection control governs the site as much as safety does, with sealed hoardings, negative pressure in work zones, and dust and water management written into the contract because construction dust near immunocompromised patients is a clinical risk. Noise and vibration limits follow ward and theatre timetables rather than working hours.
Because the brief is complex and the risk is high, buyers in this category often avoid a straight lowest-price competition. Two-stage tendering and early contractor involvement are common: the contractor is selected on team, approach and preliminaries early, then works with the design team before a final price is agreed. Commissioning is a distinct and heavily specified phase, with clinical staff training, equipment installation and validation of every serviced system before handover, and the completion date that matters is the one the building can safely treat patients on, not the one the builder leaves.
This section describes how this category is bought generally, across the public buyers that publish it. The figures elsewhere on this page are measured for this market alone.
Who buys hospital construction in Austria?
GlobalGov holds 814 hospital construction records from 247 distinct buying organisations in Austria. The most frequent publishers are Stadt Wien - Wiener Wohnen (48 records); Bundesimmobiliengesellschaft m.b.H. (42 records); Innsbrucker Immobilien GmbH & Co KG (36 records); Österreichische Gesundheitskasse (30 records); Kuratorium Wiener Pensionisten - Wohnhäuser (21 records); Wiener Gesundheitsverbund Projektentwicklungs- und Baumanagement GmbH (19 records). Between them the 6 largest account for 24% of everything published, so buying here is spread across many separate authorities.
| Buying organisation | Records | Share |
|---|---|---|
| Stadt Wien - Wiener Wohnen | 48 | 5.9% |
| Bundesimmobiliengesellschaft m.b.H. | 42 | 5.2% |
| Innsbrucker Immobilien GmbH & Co KG | 36 | 4.4% |
| Österreichische Gesundheitskasse | 30 | 3.7% |
| Kuratorium Wiener Pensionisten - Wohnhäuser | 21 | 2.6% |
| Wiener Gesundheitsverbund Projektentwicklungs- und Baumanagement GmbH | 19 | 2.3% |
What are hospital construction contracts worth in Austria?
113 of the 814 records publish a contract value. The median is $1.6M and the largest single published value is $136.7M. By size, 4 under $100k, 34 between $100k and $1M, 62 between $1M and $10M, 13 above $10M. The remaining 701 publish no value at all, so every figure here describes the priced subset only, and values are as stated by the buyer rather than as finally awarded.
| Contract size | Records | Share of priced |
|---|---|---|
| under $100k | 4 | 3.5% |
| between $100k and $1M | 34 | 30% |
| between $1M and $10M | 62 | 55% |
| above $10M | 13 | 12% |
How long do bidders get to respond to hospital construction tenders in Austria?
Across the 169 Austria hospital construction notices that publish both a publication date and a closing date, the median response window is 36 days. A quarter of them allowed 33 days or fewer and a quarter stayed open for more than 43. Not one of them closed within a fortnight of being published, so the window on this market is consistently workable.
How often are hospital construction tenders published in Austria?
Austria publishes about 6 notices a month in this category, 72 in the last twelve months. That is 63% fewer than the 195 published in the twelve months before that. Over the last three years there were 422, spread across 61 separate months of activity since 28 May 2021. December is historically the busiest month. No new notice has been published in this category since 26 May 2026, 128 days ago, so treat the figures above as a record of the market rather than as this week's pipeline.
How does Austria compare with other hospital construction markets?
Among the 40 countries where GlobalGov holds a comparable hospital construction market, Austria ranks 13th by number of records. The largest is Colombia (12,404 records against 814 here). Within Austria itself, hospital construction is the 3rd largest of the 44 procurement categories tracked here.
Where do the Austria hospital construction records on this page come from?
These 814 records are collected from 1 official source: TED (814). GlobalGov is an independent aggregator and is not affiliated with any of them; each record links back to the notice on its issuing portal. The set is rebuilt nightly, and the counts on this page were taken on 2026-10-01.
Most recent Hospital Construction tenders in Austria
None of these are open for bids now — they are the most recent records GlobalGov holds for this market, kept here so the shape of a typical hospital construction notice in Austria is visible. Set an alert to be told when the next one opens.
Austria – Building construction work – (ProVia-ID 146913) BFZ Wels + IM2110.03 ASC Wels; Teil-GU Hochbau
Austria – Flats construction work – Baukonzession Geförderte Mietwohnungen für Senioren in Freistadt
Austria – Building construction work – Neubau Hallenbad Klagenfurt, Gewerk Teil GU 2
Austria – Market construction work – FHK - Supermarkt
Austria – Hotel construction work – FHK - Hotel
Austria – Market construction work – FHK - Supermarkt
Austria – Building construction work – Neuer Standort: Rehabilitationszentrum Engelsbad, „Planung und Realisierung (TU im Sinne einer Realisierungspartnerschaft)"
Austria – Building construction work – Neuer Standort: Rehabilitationszentrum Engelsbad, „Planung und Realisierung (TU im Sinne einer Realisierungspartnerschaft)"
Austria – Primary school construction work – Vergabeverfahren „Umbau und Aufstockung des bestehenden Volksschul- und Kindergartengebäude als Totalübernehmer“
Other procurement categories in Austria
Hospital Construction procurement in other markets
Never Miss a Austria Government Contract
Finding Austria tenders usually means a local portal, a local registration and someone who reads the language. Get an alert you can read when a new hospital construction opportunity is published there.
Start Free Trial