Rehabilitation of the Çorum Alaca Dam Irrigation System

World Bank -- Turkey Resilient Landscape Integration Project (TULIP) · Turkiye government procurement

Bidding on World Bank-funded work in Turkiye? Get new Maintenance & Repair tenders there by email, free: Set up alerts

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

November 02, 2026
Response Due
Active
Status

Opportunity Overview

TÜRKYE DAYANIKLI PEYZAJ ENTEGRASYONU PROJES (P172562)

DEVLET SU LER GENEL MÜDÜRLÜÜ

“ÇORUM ALACA BARAJI SULAMASI YENLEMES”

SÖZLEME NO.: TR-OGM-PCU-556359-CW-RFB

Ülke: Türkiye

Proje Ad: TÜRKYE DAYANIKLI PEYZAJ ENTEGRASYONU PROJES (P172562)

Sözleme Bal: Çorum Alaca Baraj Sulamas Yenilemesi

Kredi No.: 9272-TR

RFB Referans No.: TR-OGM-PCU-556359-CW-RFB

1. Devlet Su leri Genel Müdürlüü, “Türkiye Dayankl Peyzaj Entegrasyonu Projesi” giderlerinin karlanmas için Dünya Bankas’ndan finansman temin etmitir ve söz konusu finansman tutarlarnn bir bölümünü “ÇORUM ALACA BARAJI SULAMASI YENLEMES” iinin sözlemesi kapsamndaki ödemeler için kullanacaktr.

2. Devlet Su leri Genel Müdürlüü (dare/veren), Çorum Alaca Baraj Sulamas Yenilemesi ii için Dünya Bankas satn alma esas ve usulleri dorultusunda, uygun teklif sahiplerini kapal zarf usulü teklif vermeye davet etmektedir.

in kapsamnda; aada belirtilen ilerin yaplmas planlanmaktadr.

1.887 ha tarm alannn sulanmas için gerekli olan;

• 39382,00 m uzunluunda, muhtelif çap ve basnçlarda HDPE (PE100) borular ve özel parçalar ile 1191,00 uzunluunda muhtelif çap ve 16 atm basnçta ÇELK borular ve balant parçalarnn temini, 11192,00 m uzunluunda muhtelif çap ve basnçlarda CTP borular ve özel parçalarnn döenmesi; (toplam 51765,00 m) boru ve özel parçalarnn döenmesi, boru hendek kaz ve dolgularnn yaplmas,
• Boru hatlarnda 29850,00 m uzunluunda iletme ve bakm yolu yaplmas,
• Sulama ebekesi üzerinde bulunan her tip, çap ve basnçtaki ayrm vanas, hava vanas (vantuz), su alma vanas (hidrant), hat kapama vanas, cazibeli ve pompajl ara ve hatsonu tahliye, yatay ve düey beton ve/veya betonarme dirsek tespit kitlesi, yol geçii (aç-kapa ve/veya yatay sondaj), dere geçii vs. yaplarn inas.

Sözleme süresi, Kusur Sorumluluk Süresi hariç olmak üzere 450 (dörtyüzelli) takvim günüdür.

3. hale, Dünya Bankas’nn “IPF Borçlular için Satn Alma Düzenlemelerinde (Kasm 2020’de yaymlanan) belirtilen ekilde Teklife Çar (RFB) yaplarak ulusal rekabetçi ihale...

Want more tenders like this one?

We will email you a free list of open Maintenance & Repair tenders in Turkiye, usually within 10 minutes. No account needed.

How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.

Bidding on this? Book 15 minutes with us and we will pull the documents, past awards and a translation for this tender live with you. Book a walkthrough

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, cancel anytime.

Start a free GlobalGov account

Solicitation Details

Issuing agencyWorld Bank -- Turkey Resilient Landscape Integration Project (TULIP)
CountryTurkiye
CategoryMaintenance & Repair
PublishedSeptember 22, 2026
Procurement stageRequest for Proposal (RFP)
Response dueNovember 02, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedOctober 23, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Related Opportunities in Turkiye

Dibektaşı (Lot 1), Gölköy (Lot 2) and Gürgentepe (Lot 3) Forest Management Chiefships – Construction of Flood Control Projects
Construction Project for the Asartepe Recreation Area
Korgan 1 (Lot 1), Korgan 2 (Lot 2) and Fatsa (Lot 3) Forest Management Chiefships – Construction of Flood Control Projects
Consulting services for conducting energy audits, preparing detailed designs and technical specifications, and supervising the renovation works for buildings in Konya province (21 building blocks across 13 campuses, with a total area of 99,201.42 m²)
Hiring of Independent Consultant for preparation of Audit and Assessment Reports Group-1 (Gümenek Regulator, Almus Dam, Ataköy Dam, Omala Dam) TIMP2
Preparation of Saltbush Seedlings for Shipment, Transport, Preparation of Planting Site, and Planting Operations
Construction Works for Seismic Retrofitting and Energy Efficiency Renovation of Public Buildings in Kocaeli (3 Buildings at the TÜBİTAK Gebze Campus)
Procurement of a Trial Plot Harvester for R&D Activities within the Scope of the Tardip Project

See every Turkiye Maintenance & Repair opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →