The development objective of First Phase of the Accelerating Transport and Trade Connectivity in Eastern South Asia Project is to increase the efficiency and resilience of trade and transport along selected corridors in Nepal. This project has four components. 1) The first component, Digital Systems for Trade, has the following sub-components: (i) Design, supply, development, installation, configuration, and testing of an electronic automated border management system, including an electronic cargo tracking system; (ii) – Design, supply, development, installation, configuration, and testing of a business intelligence and data analytics system and risk engine; (iii) Deployment of intelligence systems related to data networks, closed-circuit television (CCTV) systems, and other monitoring systems, through the upgrading of hardware and software systems; and (iv) Design, supply, development, installation, configuration, and testing of a web-based supply management information system for the automation of registration processes and permits. 2) The second component, Green and Resilient Transport and Trade Infrastructure, has the following sub-components: (i) Upgrading works and construction supervision for the Butwal-Gorusinghe-Chanauta (BGC) road section; (ii) Detailed design, construction, and construction supervision of a green resilient urban bridge, including the construction of a green climate-resilient four-lane bridge; (iii) Development and implementation of a green resilient highway corridor concept and strategy to support the development, approval, and implementation of an integrated strategy. 3) The third component, Institutional and Policy Strengthening for Transport and Trade, has the following sub-components: (i) Providing technical assistance to advance Nepal’s preparedness and subsequent implementation of the Motor Vehicle Agreement (MVA); (ii) Supporting customs reforms; (iii) – Supporting implementation of private sector support initiatives; (iv)...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | World Bank – IBRD |
|---|
| Country | Nepal |
|---|
| Category | Freight and Logistics |
|---|
| Published | June 28, 2022 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | June 28, 2022 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | August 12, 2026 |
|---|
Source: The World Bank — Open Data, licensed CC BY 4.0.
See every Nepal Freight and Logistics opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Nepal Freight and Logistics intelligence report in your inbox
A personalized report on Nepal Freight and Logistics opportunities, emailed in 5-10 minutes. One per month, no account needed.