AFR RI-3A Tanzania-Zambia Transmission Interconnector

World Bank – IBRD · United Republic of Tanzania government procurement

This opportunity is now closed. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

The development objective of the Transmission Interconnector Project for Tanzania is to (i) increase power transmission capacity to southern regions of Tanzania and (ii) strengthen institutional capacity in Tanzania and of the Eastern Africa Power Pool for regional power trade. This project has four component. First component, transmission infrastructure extension includes construction of approximately 620 km of 400 kV double circuit transmission lines, starting in Iringa through Kisada and Mbeya to Tunduma and continuing from Tunduma to Sumbawanga to link the Tanzanian North-West Grid to the interconnector with Zambia. This component cover the electrical and civil works, switchgear, control-protection-communication, supervisory control and data acquisition (SCADA), and auxiliary system equipment along the entire transmission route and in all substations, including required spares for transmission lines and substations. Second component, Tanzania Electric Supply Company Limited (TANESCO) transmission system readiness for interconnection and corporate commercial management improvements includes (i) a technical assessment of TANESCO’s transmission system to identify the operational, planning, and technical gaps in meeting the requirements for operational integration in the Southern African Power Pool (SAPP) and the Eastern Africa Power Pool (EAPP) to comply with the requirements for power system stability, operational ancillary enabling services, frequency synchronization, tie-line control, protection, metering, and other technical standards, and (ii) procurement and installation of necessary additional equipment and reinforcements of the generation/transmission system infrastructure to ensure that the Tanzanian grid meets all operating requirements of the interconnected networks, can synchronize with the EAPP and SAPP systems, and can engage reliably and efficiently in power trade with Zambia and Kenya and in the SAPP and EAPP markets. This component will support...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyWorld Bank – IBRD
CountryUnited Republic of Tanzania
CategoryTechnology
PublishedJune 18, 2018
Procurement stageActive solicitation
ClosedClosing date not published
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedSeptember 24, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

See every United Republic of Tanzania Technology opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United Republic of Tanzania Technology intelligence report in your inbox

A personalized report on United Republic of Tanzania Technology opportunities, emailed in 5-10 minutes. One per month, no account needed.