CONSTRUCTION OF THE IMPERIAL PARK SPORTS COMPLEX Items: WORK 1 - REMOVAL OF DEBRIS WITH METAL DUMPSTER, INCLUDING MANUAL LOADING AND UNLOADING AT A DUMP; WORK 1 - CUTTING, TRIMMING AND REMOVAL OF TREES INCLUDING ROOTS DIAM. > 5 AND < 15CM; WORK 1 - CUTTING AND LOADING TO A DUMP, INCLUDING TRANSPORT UP TO 1KM; WORK 1 - SUPPLY OF SOIL, INCLUDING CUTTING, LOADING, UNLOADING AND TRANSPORT UP TO 1KM; WORK 1 - FILLING, INCLUDING COMPACTION; WORK 1 - TRANSPORT OF SOIL BY DUMP TRUCK, FROM 1KM; WORK 1 - CRUSHED STONE BALLAST; WORK 1 - METAL FENCE WITH METAL SHEET, UNPAINTED, TRAPEZOIDAL 40 THICKNESS = 0.43MM, COLUMNS, BASES AND SCREWS; WORK 1 - METAL CONSTRUCTION GATE - 5M, PIVOTING, 2 LEAVES, FOR FENCE; WORK 1 - PEDESTRIAN GATE - 1.15M, FOR FENCE
This opportunity was awarded to LOPES KALIL ENGENHARIA E COMERCIO LTDA on August 24, 2026.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Municipio DE Barueri |
|---|
| Country | Brazil |
|---|
| Category | Building Construction |
|---|
| Estimated value | $9.5M |
|---|
| Published | June 10, 2026 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | August 04, 2026 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Award outcome | Awarded to LOPES KALIL ENGENHARIA E COMERCIO LTDA · August 24, 2026 |
|---|
| Original language | Portuguese — members read it in their own language |
|---|
| Official source | View original notice |
|---|
| Last verified | October 09, 2026 |
|---|
Source: Portal Nacional de Contratações Públicas (PNCP), Government of Brazil — open data under Lei 12.527/2011 and Decreto 8.777/2016. Not affiliated with the Government of Brazil.
Comprehensive contracting of a company specializing in the preparation of basic and detailed design plans, architectural and complementary engineering designs, obtaining approvals from the relevant authorities, and construction work, for the construction of the Goioerê Women’s Penitentiary, with an estimated area of 7,537.14 m² (seven thousand, five hundred thirty-seven square meters and fourteen hundredths), to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná Integrated contracting of a company specializing in the preparation of basic and detailed design plans, architectural designs, and complementary engineering designs; obtaining approvals from the relevant agencies—ETAPA. 1; and construction work - ETAPA 2, for the construction of the Goioerê women’s prison, with an estimated area of 7,537. 14 square meters, seven thousand, five hundred thirty-seven square meters and fourteen hundredths, to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná See every Brazil Building Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Brazil Building Construction intelligence report in your inbox
A personalized report on Brazil Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.