SEMI: Contract for the construction and asphalt paving CBUQ of the road COM along a TOTAL stretch of 7.36 km 78.496.36 m, connecting KM 475 DA BR 373 to BR 158 and KM 58 DA PR 562 COM execution of preliminary services, earthworks, drainage BASE and SUB BASE surfacing MEIO FIO and curbs, traffic signage, street lighting, miscellaneous services, technical tests, and others ITENS and specifications available at EM project
Original title (Portuguese): CONTRATACAO SEMI INTEGRADA PARA IMPLANTACAO E PAVIMENTACAO ASFALTICA CBUQ DE CONTORNO VIARIO COM EXTENSAO TOTAL DE 7 36KM 78.496 36 M INTERLIGANDO O KM 475 DA BR 373 A BR 158 E O KM 58 DA PR 562 COM EXECUCAO DE SERVICOS DE SERVICOS PRELIMINARES TERRAPLANAGEM DRENAGEM BASE E SUB BASE REVESTIMENTO MEIO FIO E SARJETA SINALIZACAO DE TRANSITO ILUMINACAO PUBLICA SERVICOS DIVERSOS ENSAIOS TECNOLOGICOS E DEMAIS ITENS E ESPECIFICACOES CONSTANTES EM PROJETO.
Municipio DE Coronel Vivida · Brazil government procurement
GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.
September 09, 2026
Response Due
CONTRATACAO SEMI INTEGRADA PARA IMPLANTACAO E PAVIMENTACAO ASFALTICA CBUQ DE CONTORNO VIARIO COM EXTENSAO TOTAL DE 7 36KM 78.496 36 M INTERLIGANDO O KM 475 DA BR 373 A BR 158 E O KM 58 DA PR 562 COM EXECUCAO DE SERVICOS DE SERVICOS PRELIMINARES TERRAPLANAGEM DRENAGEM BASE E SUB BASE REVESTIMENTO MEIO FIO E SARJETA SINALIZACAO DE TRANSITO ILUMINACAO PUBLICA SERVICOS DIVERSOS ENSAIOS TECNOLOGICOS E DEMAIS ITENS E ESPECIFICACOES CONSTANTES EM PROJETO. Itens: Contratacao semi integrada para implantacao e pavimentacao asfaltica CBUQ de contorno viario com extensao total de 7 36km 78.496 36 m interligando o km 475 da BR 373 a BR 158 e o km 58 da PR 562 com execucao de servicos de servicos preliminares terraplanagem drenagem base e sub base revestimento meio fio e sarjeta sinalizacao de transito iluminacao publica servicos diversos ensaios tecnologicos e demais itens e especificacoes constantes em projeto. Trechos Implantacao de nova estrada interligando a BR 373 a BR 158 e a PR 562.
This is one of 632 active Brazil Technology opportunities most of your competitors will never see.
Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Municipio DE Coronel Vivida |
|---|
| Country | Brazil |
|---|
| Category | Technology |
|---|
| Estimated value | $10.0M |
|---|
| Published | July 17, 2026 |
|---|
| Procurement stage | Request for Proposal (RFP) |
|---|
| Response due | September 09, 2026 |
|---|
| Status | Open — accepting responses |
|---|
| Translation | Translated from Portuguese by GlobalGov’s translation pipeline |
|---|
| Official source | View original notice |
|---|
| Last verified | August 09, 2026 |
|---|
Source: Portal Nacional de Contratações Públicas (PNCP), Government of Brazil — open data under Lei 12.527/2011 and Decreto 8.777/2016. Not affiliated with the Government of Brazil.
Paving of a local road inCBUQ, covering 34,800 m², including preliminary work, earthworks, base and subbase layers, curbs with gutters, traffic signage, drainage, technical testing, and a construction sign. Sections of the Alto Caravaggio Road Contracting of a private company to provide public passenger transport services for the Curitiba metropolitan region (STPP/RMC), using tire-based rolling stock, in 4 lots, according to the technical definitions described in the preliminary technical study, in the manner, form and conditions established by the tender notice to be published, including the entire scope related to the operation of the integrated systems, including ticketing, user service, fleet management, garage management, and... See every Brazil Technology opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Brazil Technology intelligence report in your inbox
A personalized report on Brazil Technology opportunities, emailed in 5-10 minutes. One per month, no account needed.