Integrated “SEMI” contract with a specialized engineering firm for the design and construction of a water supply “OBRAS” NO in the municipality
Original title (Portuguese): CONTRATAÇÃO SEMI INTEGRADA DE EMPRESA DE ENGENHARIA ESPECIALIZADA PARA IMPLANTAÇÃO E EXECUÇÃO DE OBRAS DE ABASTECIMENTO DE ÁGUA NO MUNICÍPIO.
Municipio DE Tres Barras · Brazil government procurement
Closed July 28, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.
Semi-integrated contracting of a specialized engineering company for the implementation and execution of water supply works in the municipality. Items: Semi-integrated contracting of a specialized engineering company for the implementation and execution of water supply works in the municipality of Três Barras - SC.
This opportunity was awarded to CONSORCIO AGUA PARA TODOS on September 10, 2026.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Municipio DE Tres Barras |
|---|
| Country | Brazil |
|---|
| Category | Building Construction |
|---|
| Estimated value | $3.4M |
|---|
| Published | September 30, 2025 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | July 28, 2026 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Award outcome | Awarded to CONSORCIO AGUA PARA TODOS · September 10, 2026 |
|---|
| Original language | Portuguese — members read it in their own language |
|---|
| Official source | View original notice |
|---|
| Last verified | October 11, 2026 |
|---|
Source: Portal Nacional de Contratações Públicas (PNCP), Government of Brazil — open data under Lei 12.527/2011 and Decreto 8.777/2016. Not affiliated with the Government of Brazil.
Comprehensive contracting of a company specializing in the preparation of basic and detailed design plans, architectural and complementary engineering designs, obtaining approvals from the relevant authorities, and construction work, for the construction of the Goioerê Women’s Penitentiary, with an estimated area of 7,537.14 m² (seven thousand, five hundred thirty-seven square meters and fourteen hundredths), to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná Integrated contracting of a company specializing in the preparation of basic and detailed design plans, architectural designs, and complementary engineering designs; obtaining approvals from the relevant agencies—ETAPA. 1; and construction work - ETAPA 2, for the construction of the Goioerê women’s prison, with an estimated area of 7,537. 14 square meters, seven thousand, five hundred thirty-seven square meters and fourteen hundredths, to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná See every Brazil Building Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Brazil Building Construction intelligence report in your inbox
A personalized report on Brazil Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.