The purpose of this bid is the semi-integrated contracting of a specialized company to prepare the detailed design and carry out construction work involving box gabions and Reno mattresses in the municipality of Guaíba, in accordance with the conditions, quantities, and requirements set forth in this document, to meet the needs of the municipal government. The breakdown of the bidding process can be found in Annex I—the Terms of Reference for this call for bids. The purpose of the co
Original title (Portuguese): O objeto da presente licitação é a contratação semi-integrada de empresa especializada para elaboração do projeto executivo e execução das obras de gabiões caixa e colchões reno, no município de Guaíba, conforme condições, quantidades e exigências estabelecidas neste instrumento, para atender as necessidades da Administração Pública Municipal. A forma como a licitação está dividida pode ser verificada no Anexo I – Termo de Referência deste Edital. O objeto da co
Municipio DE Guaiba · Brazil government procurement
Closed September 18, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.
[Portal de Compras Públicas] - O objeto da presente licitação é a contratação semi-integrada de empresa especializada para elaboração do projeto executivo e execução das obras de gabiões caixa e colchões reno, no município de Guaíba, conforme condições, quantidades e exigências estabelecidas neste instrumento, para atender as necessidades da Administração Pública Municipal. A forma como a licitação está dividida pode ser verificada no Anexo I – Termo de Referência deste Edital. O objeto da contratação está estruturado em 3 (três) lotes distintos, abrangendo a totalidade da extensão prevista de 2.417,14 metros, conforme segue: LOTE 01: Av. Lupicínio Rodrigues, trecho compreendido entre as estacas 0+619,66 e 1+548,66, com uma extensão de 893,00m (Início: 30°05`24.1"S 51°19`57.6"W / Fim: 30°05`22.9"S 51°19`23.3"W); LOTE 02: Av. Recife e Rua Sd. Mário Luis de Souza Soares, trecho compreendido entre as estacas 1+558,78 e 2+320,72, com uma extensão de 741,95m (Início: 30°05`22.7"S 51°19`22.6"W / Fim: 30°05`38.9"S 51°19`12.2"W); LOTE 03: Rua da Antena, trecho compreendido entre as estacas 2+345,72 e 3+127,91, com uma extensão de 782,19m (Início: 30°05`38.9"S 51°19`11.3"W / Fim: 30°05`27.2"S 51°18`47.8"W). O objeto está vinculado ao Termo de Compromisso OGU MCIDADES 985353/2025 - Novo PAC, Eixo: Cidades Sustentáveis e Resilientes, Subeixo: Prevenção a Desastres – Drenagem Urbana, devendo a contratada observar todas as exigências e condicionantes constantes no referido instrumento. Itens: Av. Recife e Rua Sd. Mário Luis de Souza Soares (Est.: 1+558,78 - 2+320,72) - Av. Recife e Rua Sd. Mário Luis de Souza Soares (Est.: 1+558,78 - 2+320,72). Extensão (m) 741,95; Rua da Antena (Est.: 2+345,72 - 3+127,91) - Rua da Antena (Est.: 2+345,72 - 3+127,91). Extensão (m) 782,19; Av. Lupicínio Rodrigues (Est.: 0+619,66 - 1+548,66) - Av. Lupicínio Rodrigues (Est.: 0+619,66 - 1+548,66). Extensão (m) 893,00
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Municipio DE Guaiba |
|---|
| Country | Brazil |
|---|
| Category | Building Construction |
|---|
| Estimated value | $7.5M |
|---|
| Published | July 28, 2026 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | September 18, 2026 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Original language | Portuguese — members read it in their own language |
|---|
| Official source | View original notice |
|---|
| Last verified | October 09, 2026 |
|---|
Source: Portal Nacional de Contratações Públicas (PNCP), Government of Brazil — open data under Lei 12.527/2011 and Decreto 8.777/2016. Not affiliated with the Government of Brazil.
Comprehensive contracting of a company specializing in the preparation of basic and detailed design plans, architectural and complementary engineering designs, obtaining approvals from the relevant authorities, and construction work, for the construction of the Goioerê Women’s Penitentiary, with an estimated area of 7,537.14 m² (seven thousand, five hundred thirty-seven square meters and fourteen hundredths), to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná Integrated contracting of a company specializing in the preparation of basic and detailed design plans, architectural designs, and complementary engineering designs; obtaining approvals from the relevant agencies—ETAPA. 1; and construction work - ETAPA 2, for the construction of the Goioerê women’s prison, with an estimated area of 7,537. 14 square meters, seven thousand, five hundred thirty-seven square meters and fourteen hundredths, to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná See every Brazil Building Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Brazil Building Construction intelligence report in your inbox
A personalized report on Brazil Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.