Purchase of construction materials necessary for the continuation and completion of the construction of 50 (fifty) housing units, located at the initial coordinates of lat. 10º38’13.00”S and long. 55°42’32.69”W, covering a total area of 12,000.00 m², in the municipality of Nova Canaã do Norte/MT
Original title (Portuguese): Aquisição de materiais de construção necessários para a continuidade e conclusão da obra de construção de 50 (cinquenta) unidades habitacionais, localizadas nas coordenadas iniciais Lat. 10º38’13,00”S e Long. 55º42’32,69”O, em área total de 12.000,00 m², no município de Nova Canaã do Norte/MT
Municipio DE Nova Canaa DO Norte · Brazil government procurement
Closed July 29, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.
Acquisition of construction materials necessary for the continuation and completion of the construction of 50 (fifty) housing units, located at the initial coordinates Lat. 10º38’13.00”S and Long. 55º42’32.69”W, in a total area of 12,000.00 m², in the municipality of Nova Canaã do Norte/MT. 10º38’13.00”S and Long. 55º42’32.69”W, in a total area of 12,000.00 m², in the municipality of Nova Canaã do Norte/MT. Items: Reinforced concrete ring, perforated, for septic tanks and soakaways, without bottom, internal diameter of 2.00m and height of 0.50m; Reinforced concrete ring, smooth, for inspection wells, without bottom, internal diameter of 0.60m and height of 0.50m; Clay/ceramic tile, unglazed, Roman, American, Portuguese, French type, length of 41 cm, yield of 16 tiles/m². Reinforced concrete ring, smooth, for manholes, inspection wells, septic tanks and soakaways, bottomless, internal diameter of 1.20m and height of 0.50m; Polyethylene water tank with a minimum capacity of 1,000 liters, with lid; Toilet bowl (toilet) with attached tank, exposed siphon, white ceramic (without seat); AC I adhesive mortar for ceramics.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Municipio DE Nova Canaa DO Norte |
|---|
| Country | Brazil |
|---|
| Category | Building Construction |
|---|
| Estimated value | $75,742 |
|---|
| Published | July 16, 2026 |
|---|
| Procurement stage | Request for Proposal (RFP) |
|---|
| Closed | July 29, 2026 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Original language | Portuguese — members read it in their own language |
|---|
| Official source | View original notice |
|---|
| Last verified | October 11, 2026 |
|---|
Source: Portal Nacional de Contratações Públicas (PNCP), Government of Brazil — open data under Lei 12.527/2011 and Decreto 8.777/2016. Not affiliated with the Government of Brazil.
Comprehensive contracting of a company specializing in the preparation of basic and detailed design plans, architectural and complementary engineering designs, obtaining approvals from the relevant authorities, and construction work, for the construction of the Goioerê Women’s Penitentiary, with an estimated area of 7,537.14 m² (seven thousand, five hundred thirty-seven square meters and fourteen hundredths), to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná Integrated contracting of a company specializing in the preparation of basic and detailed design plans, architectural designs, and complementary engineering designs; obtaining approvals from the relevant agencies—ETAPA. 1; and construction work - ETAPA 2, for the construction of the Goioerê women’s prison, with an estimated area of 7,537. 14 square meters, seven thousand, five hundred thirty-seven square meters and fourteen hundredths, to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná See every Brazil Building Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Brazil Building Construction intelligence report in your inbox
A personalized report on Brazil Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.