Remaining sections of the BR-367/MG project—km 0 to 61.6—bridges over the Areinha Creek, the Lapa Creek, and the Jacinto Creek

Original title (Portuguese): Remanescentes obras BR-367/MG - Km 0 ao 61,6 - Pontes sobre o Córrego Areinha, sobre o Córrego da Lapa e sobre o Córrego Jacinto

Dnit-departamento Nacional DE Infraest DE Transportes · Brazil government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$1.5M
Est. Value
September 28, 2026
Response Due
Active
Status

Opportunity Overview

Remanescentes obras BR-367/MG - Km 0 ao 61,6 - Pontes sobre o Córrego Areinha, sobre o Córrego da Lapa e sobre o Córrego Jacinto Itens: Serviço Engenharia Serviço Engenharia

This Brazil Construction opportunity is one most of your competitors will never see.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyDnit-departamento Nacional DE Infraest DE Transportes
CountryBrazil
CategoryConstruction
Estimated value$1.5M
PublishedAugust 18, 2026
Procurement stageRequest for Proposal (RFP)
Response dueSeptember 28, 2026
StatusOpen — accepting responses
Original languagePortuguese — members read it in their own language
Official sourceView original notice
Last verifiedSeptember 27, 2026

Source: Portal Nacional de Contratações Públicas (PNCP), Government of Brazil — open data under Lei 12.527/2011 and Decreto 8.777/2016. Not affiliated with the Government of Brazil.

Related Opportunities in Brazil

Integrated contract for the preparation of engineering designs (preliminary/detailed) and for the construction of the southeastern/northeastern bypass of Goiânia
Integrated contracting of specialized company(ies) to provide engineering design and construction services for the planning and construction of an overpass on theBR-070/GO highway, in the municipality of Águas Lindas de Goiás /GO
Hiring of a company to prepare studies, basic and detailed engineering designs, and carry out road safety improvement works, including all operations necessary for the installation of eight pedestrian overpasses located at BR-158, BR-287, and BR-392, under the jurisdiction of the Santa Maria local unit /RS (single lot)
Hiring of a specialized company to conduct tests using the heavy vehicle simulator (HVS), in 15 (fifteen) test runs, as well as to provide specialized technical consulting services, on an as-needed basis, for a period of 60 (sixty) months,
Hiring of a specialized firm to prepare the preliminary design for the construction of the Curitiba municipal rail bypass in the state of Paraná, including the construction of a new rail yard to mitigate conflicts between the rail system and the road network within the urban perimeter, and the construction of special engineering structures along the EF-277/PR railway line
Hiring of a specialized firm to prepare the studies, basic design, and detailed engineering design for the capacity expansion project—including road widening, safety improvements, and the elimination of critical sections—on the BR-364/RO highway, section: entrance BR-174(b)/435(a) (Vilhena) – junction RO/AC, subsection: end of the dual-lane section (UNIR) – junction RO/AC, segment: km 724.10 to km 1091.50, totaling: 367.40 km, single lot – reopening of electronic bidding No. 90177/2026-22
Hiring of a company to prepare the studies, basic and detailed engineering designs, and carry out the rehabilitation work on three (3) special engineering structures (OAS), located on Highway 367/MG, namely: the bridge over the Barra Nova Creek, the bridge over the Santo Antônio Creek, and the bridge over the São Miguel River
Hiring of a specialized company for the execution of supervision services for O&M (operation and maintenance) activities of dams and locks under the jurisdiction of DNIT/RS.

See every Brazil Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Brazil Construction intelligence report in your inbox

A personalized report on Brazil Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.