Renovation and expansion of the Col. Manoel Dias Ferraz Municipal School in the Estação neighborhood, as part of the “Mãos Dadas” project—renovation and expansion—work proposal 5650/2023 – Work Plan 567/2024 – Agreement No. 1261000806/2024

Original title (Portuguese): Reforma e Ampliação da Escola Municipal Cel. Manoel Dias Ferraz, no Bairro Estação, em decorrência do Projeto Mãos Dadas – Reforma e Ampliação – Proposta de Trabalho 5650/2023 – Plano de Trabalho 567/2024 – Convênio n°1261000806/2024

Municipio DE SAO Lourenco · Brazil government procurement

Closed August 17, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$190,000
Est. Value
Closed
Status

Opportunity Overview

Reforma e Ampliação da Escola Municipal Cel. Manoel Dias Ferraz, no Bairro Estação, em decorrência do Projeto Mãos Dadas – Reforma e Ampliação – Proposta de Trabalho 5650/2023 – Plano de Trabalho 567/2024 – Convênio n°1261000806/2024 Itens: FORNECIMENTO E COLOCAÇÃO DE PLACA DE OBRA EM CHAPA GALVANIZADA #26, ESP. 0,45 MM, PLOTADA COM ADESIVO VINÍLICO, AFIXADA COM REBITES 4,8X40 MM, EM ESTRUTURA METÁLICA DE METALON 20X20 MM, ESP. 1,25 MM, INCLUSIVE SUPORTE EM EUCALIPTO AUTOCLAVADO PINTADO COM TINTA PVA DUAS (2) DEMÃOS; LOCAÇÃO DE OBRA COM GABARITO DE TÁBUAS CORRIDAS PONTALETADAS A CADA 2,00M, REAPROVEITAMENTO (2X), INCLUSIVE ACOMPANHAMENTO DE EQUIPE TOPOGRÁFICA PARA MARCAÇÃO DE PONTOTOPOGRÁFICO; TAPUME FIXO DE PROTEÇÃO PARA FECHAMENTO DE OBRA EM TELHA METÁLICA GALVANIZADA, TIPO TRAPEZOIDAL, ESP. 0,5MM, COM MÓDULO NA DIMENSÃO DE (300X220)CM, COM REAPROVEITAMENTO, EXCLUSIVE PINTURA ESMALTE, INCLUSIVE PONTALETE E FIXAÇÃO; BARRACÃO DE OBRA, EM CHAPA DE COMPENSADO RESINADO, INCLUSIVE INSTALAÇÕES SANITÁRIAS E MOBILIÁRIO - PADRÃO DER-MG; PROJETO EXECUTIVO DE INSTALAÇÕES ELÉTRICAS; PROJETO EXECUTIVO DE ESTRUTURA DE CONCRETO; PROJETO EXECUTIVO DE INSTALAÇÕES HIDRO SANITÁRIAS; PROJETO EXECUTIVO DE INFRAESTRUTURA DE CABEAMENTO ESTRUTURADO/CFTV/ALARME/SEGURANÇA/SONORIZAÇÃ O; APILOAMENTO MECANIZADO EM FUNDO DE VALA COM PLACA VIBRATÓRIA, EXCLUSIVE ESCAVAÇÃO - VB; REATERRO MANUAL DE VALA, INCLUSIVE ESPALHAMENTO E COMPACTAÇÃO MECANIZADA COM PLACA VIBRATÓRIA - VB

Award Outcome

This opportunity was awarded to garant empreendimentos imobiliarios ltda on September 03, 2026.

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyMunicipio DE SAO Lourenco
CountryBrazil
CategoryBuilding Construction
Estimated value$190,000
PublishedJuly 07, 2026
Procurement stageActive solicitation
ClosedAugust 17, 2026
StatusClosed — no longer accepting responses
Award outcomeAwarded to garant empreendimentos imobiliarios ltda · September 03, 2026
Original languagePortuguese — members read it in their own language
Official sourceView original notice
Last verifiedOctober 09, 2026

Source: Portal Nacional de Contratações Públicas (PNCP), Government of Brazil — open data under Lei 12.527/2011 and Decreto 8.777/2016. Not affiliated with the Government of Brazil.

Browse Similar Open Opportunities in Brazil

PARA: the concession for the modernization, operation, maintenance, and commercial operation DO of the bus terminal DE PORTO VELHO – RO., which has already been built and is in operation, DEn an exclusive basis, hereinafter referred to simply as the TERMINAL, which is the only authorized point DE for the boarding and disembarkation DE of passengers on intercity and interstate routes operated by bus-type vehicles, as well as on interstate routes that have stops in the state capital DO, in accordance with the conditions
1.1. Integrated contracting of a specialized engineering firm to prepare the preliminary and detailed design documents, as well as to carry out the construction work and services necessary for the implementation of a water supply system in the municipality of Viseu/PA, in accordance with the guidelines, technical parameters, and solutions indicated in the preliminary design, and funded through Commitment Agreement No. 968608/2024/MCIDADES/CAIXA signed with the municipality of Viseu—PA
The purpose of this bid is the integrated contracting of a specialized company to prepare DOS basic and detailed designs and to execute DAS OBRAS urban infrastructure projects for the implementation of the MICRO stormwater drainage system, earthworks, road paving, construction of accessible sidewalks, traffic signage, and other necessary services AO project DA RUA Pinheiro Machado, including the RUAS Erechim and Francisco E. Müller, PELO proposed drainage route, compr
Comprehensive contracting of a company specializing in the preparation of basic and detailed design plans, architectural and complementary engineering designs, obtaining approvals from the relevant authorities, and construction work, for the construction of the Goioerê Women’s Penitentiary, with an estimated area of 7,537.14 m² (seven thousand, five hundred thirty-seven square meters and fourteen hundredths), to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná
Integrated contracting of a company specializing in the preparation of basic and detailed design plans, architectural designs, and complementary engineering designs; obtaining approvals from the relevant agencies—ETAPA. 1; and construction work - ETAPA 2, for the construction of the Goioerê women’s prison, with an estimated area of 7,537. 14 square meters, seven thousand, five hundred thirty-seven square meters and fourteen hundredths, to be located at BR 272, s/n, in the Goioerê Colony, municipality of Goioerê, Paraná
Hiring of a company specializing in engineering to carry out, under an INTEGRATED contracting regime, of the construction work for the second phase of the annex building of the Polytechnic School of the Federal University of Bahia (UFBA), based on the preliminary designs provided and the conditions set forth in the terms of reference and its appendices
Hiring of a company specializing in the provision of engineering services and the supply of materials for the project “Sustainable Urban Drainage and Stormwater Management Systems in the Municipality of Socorro/SP,” transfer contract No. OGU MCIDADES 953327/2023 - Operation 1092503-44, comprising the construction of dams, detention basins, canals, drainage galleries, a hydraulic bypass, desilting services, and micro-drainage works in various watersheds
Integrated contracting of specialized company(ies) to provide engineering design and construction services for the planning and construction of an overpass on theBR-070/GO highway, in the municipality of Águas Lindas de Goiás /GO

See every Brazil Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Brazil Building Construction intelligence report in your inbox

A personalized report on Brazil Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.