Egypt – Works for complete or part construction and civil engineering work – Construction of Zaghloul El Bahary Wastewater Treatment Plant (WWTP), Design – Build, Defect Liability Year, and Optional One (1) Year of Operation and Maintenance

Kafr El-Sheikh Water Supply and Sanitation Company (kswssc), Project Implementation Unit (PIU) · Egypt government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$26.9M
Est. Value
Active
Status

Opportunity Overview

The work to be carried out under this works contract comprises the permanent works (facilities and systems) related to the new Zaghoul El Bahary WWTP (15,000 m3/d, 2037 expanded to 25,000 m3/d, 2052) in Motobas District, Kafr El Sheikh Governorate, to be designed, constructed, and commissioned; the effective restoration of any defects during the 1-year Defects Liability Period; and the optional 1-year of normal operation and maintenance of the works for the WWTP. The contract comprises also the provision of training services to the Procuring Entity’s personnel duly completed within the Defects Liability Period or the Optional 1 year Operation and Maintenance Period as the case may be, and before the works hand-over. Some minor works of the Plant has been executed by another Contractor in a previous phase. Although not part of the Works, the Contractor shall be aware of its obligations toward these Existing Works as defined in the Contract Documents. Average design capacity is 15,000 m3/d (6,000 kg BOD5/d) design horizon 2037 (expanded to 25,000 m3/d, 2052). The Plant will receive influent wastewater from in-system pumping stations and treated effluent will be discharged to Zaghloul Main Drain. Process involves Extended Aeration Activated Sludge and shall target carbon, nitrogen and suspended solids removal and sludge stabilization.

This is one of 2 active Egypt Construction opportunities most of your competitors will never see.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyKafr El-Sheikh Water Supply and Sanitation Company (kswssc), Project Implementation Unit (PIU)
CountryEgypt
CategoryConstruction
Estimated value$26.9M
PublishedSeptember 03, 2026
Procurement stageRequest for Proposal (RFP)
Response dueNot specified / rolling
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedOctober 04, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

See every Egypt Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Egypt Construction intelligence report in your inbox

A personalized report on Egypt Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.