FY26 Willapa Harbor Maintenance Dredging

Endist Seattle · United States government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

November 05, 2028
Response Due
Active
Status

Opportunity Overview

PRE-SOLICITATION NOTICE

This Synopsis/Pre-Solicitation Notice is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming. All questions regarding this Synopsis/Pre-Solicitation should be submitted in writing to the Point of Contact(s) indicated below.

Construction Project: FY26 Willapa Harbor Maintenance Dredging

Pre-solicitation Notice Number: W912DW26Z1ATA

The magnitude of construction is estimated to be between $5,000,000 and $10,000,000.

The resulting contract will be firm-fixed-price.

FY26 Willapa Harbor Maintenance Dredging Project Details:

USACE Seattle District has a need for a construction dredging, project entitled FY26 Willapa Harbor Maintenance Dredging, Willapa Harbor, WA at three federal navigation features in Willapa Bay, Washington: (1) the entrance to Tokeland Marina; (2) the entrance channel to Nahcotta; and (3) the Bay Center entrance channel and basin. The work is anticipated to begin in July 2026 and all in-water work must be completed by 15 Feb 2027.

The project will require dredging via mechanical (clamshell) means to remove approximately 180,000 CY of accumulated sediment across the three project features. The minimum required dredging depth varies from -10 ft (Bay Center and Nahcotta) to -15 ft MLLW (Tokeland).

In addition, dredging of approximately 10,000 CY may be required to a minimum depth of -9 ft MLLW in the Palix River thalweg to ensure sufficient water depths for the dredge, scow, and tugboats to transit to/from Bay Center and the disposal sites. This amount has the potential to change due to the dynamic nature of the Palix River at its confluence with Willapa Bay.

Dredged material will be disposed via bottom-dump barge at the Cape Shoalwater and/or South Channel open-water disposal locations within Willapa Bay. The work window varies by project features, but ranges between 16 July through 15 Feb of any given calendar year for each specific project feature. The in-water work windows are as follows:

•...

This United States Hospital Construction opportunity is one most of your competitors will never see.

How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start a free GlobalGov account

Solicitation Details

Issuing agencyEndist Seattle
CountryUnited States
CategoryHospital Construction
NAICS237990
PSCY1KF
PublishedOctober 17, 2025
Procurement stageRequest for Proposal (RFP)
Response dueNovember 05, 2028
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedOctober 11, 2026

Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.

Related Opportunities in United States

Development of Collaborative Research Facilities or Research-Resource Facilities (C06 Clinical Trial Not Allowed)
Design Build Construction to Replace Seismically Deficient Boiler Plant, Building 8. VAMC Reno, NV. -- Y1NB
Amyotrophic Lateral Sclerosis (ALS) Intermediate Patient Population Expanded Access (U01 Clinical Trial Required)
Limited Competition: Superfund Hazardous Substance Research and Training Program (P42 Clinical Trial Optional)
Landslide Repairs in The West Region C1
Clinical Research Network on Antimicrobial Resistance (UM1 Clinical Trial Required)
HEAL Initiative: Non-addictive Analgesic Therapeutics Development [Small Molecules and Biologics] to Treat Pain (UG3/UH3 Clinical Trial Optional)
NP MACA 12(1), 908(1) - Mammoth Cave National Park

See every United States Hospital Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United States Hospital Construction intelligence report in your inbox

A personalized report on United States Hospital Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.