Automated People Mover (APM) Infrastructure

High Speed Two (HS2) Limited · United Kingdom government procurement

This opportunity is now closed. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$195.6M
Est. Value
Closed
Status

Opportunity Overview

The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport. An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network. The APM network will consist of a maintenance facility and four stops detailed herein:
I. Interchange Station stop;
II. National Exhibition Centre stop;
III. Birmingham International Railway Station stop; and
IV. Birmingham Airport stop.
The APM has been designed as an elevated mass transit system, which will transport passengers between those stops detailed above. The APM route will consist of a 2.3km long viaduct, four stops and a maintenance facility. The Interchange Station Stop is at ground level and the three other stops and maintenance facility are on the viaduct (above ground level). The route has several major crossings to navigate, such as the M42 motorway, the West Coast Main Line (WCML) and Pendigo Lake at the National Exhibition Centre (NEC) site.
The key design features of the APM Infrastructure include reinforced central concrete piers, weathered steel deck and escape walkway gratings throughout the entirety of the track. To minimise impact to the existing developed site and public roads, the entire 2.3km route is on an elevated viaduct. This is made up of a range of single and twin track at various points along the route to allow trains to pass each other.The piers range from 6 metres high to 14 metres, depending on the topography along the route. In order to maintain a consistent level for the viaduct, the columns will need to vary in height.
The stops at Birmingham Airport and at Interchange Station will have a single platform face and the...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyHigh Speed Two (HS2) Limited
CountryUnited Kingdom
CategoryRoad & Infrastructure
Estimated value$195.6M
PublishedMay 26, 2026
Procurement stageRequest for Proposal (RFP)
ClosedClosing date not published
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedOctober 11, 2026

Contains public sector information licensed under the Open Government Licence v3.0. Source: UK Government (Find a Tender).

Browse Similar Open Opportunities in United Kingdom

Security and Resilience Framework
UK Health Security Campus, Harlow – Major science, headquarters and campus infrastructure works
Sewer Rehabilitation inc. CCTV and Cleaning
WESTCharge - Electric Vehicle Charging Infrastructure
Strategic Charging Infrastructure Scheme
Highways Works Term Contract (HWTC) 23261HE (Tender Stage)
DMNH 042 - LEVI Electric Vehicle Charging Infrastructure
On Vehicle Digital Technology (AVL, CCTV, APC, TLP, Comms, On Bus Destination, AVA, Bridge Strike Systems & Vehicle Compute Capability) Franchising and Wider Transport Ticketing & Payment Consultancy Services

See every United Kingdom Road & Infrastructure opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United Kingdom Road & Infrastructure intelligence report in your inbox

A personalized report on United Kingdom Road & Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.