Nuclear power plants are complex engineering structures with a multitude of different components required to make them operate. One area that rarely hits the headlines, but it fundamental to the operation of the plant, is tribological components such as valves and pumps. These components operate in a particularly aggressive environment of a high neutron flux, high load contacts and lubricated by just superheated water. Traditionally, there has only been one material that can survive this highly hostile environment: cobalt based hardfacing alloys called Stellites. However, there is a big problem with these alloys. The exposure of cobalt to a neutron flux results in the formation of cobalt-60 radioisotope, which causes radioactive exposure by site workers and contributes to radioactive waste. The obvious answer to this problem is to remove the cobalt from the hard facing. This is a very challenging materials problem. Our hypothesis is that iron based alloys can be designed that will meet the performance standards of the current Stellites. The project will look at recently invented Fe base alloys processed through a novel laser deposition manufacturing route. The microstructures and friction and wear behaviour will be studied in detail to input into further alloy development.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | EPSRC |
|---|
| Country | United Kingdom |
|---|
| Category | Research Development |
|---|
| Published | November 06, 2023 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | November 05, 2027 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | August 10, 2026 |
|---|
Source: UK Research and Innovation (UKRI) — Open Government Licence v3.0.
See every United Kingdom Research Development opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free United Kingdom Research Development intelligence report in your inbox
A personalized report on United Kingdom Research Development opportunities, emailed in 5-10 minutes. One per month, no account needed.