Investigating and optimising linearity in load modulated balanced amplifier

EPSRC · United Kingdom government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

September 29, 2026
Response Due
Active
Status

Opportunity Overview

Three of the most important factors to consider in the design of power amplifiers (PA) are the spectral efficient, linearity and power efficiency. Usually, a compromise must be struck between these three parameters, with spectral efficiency and linearity on one side and power efficiency on the other. When trying to operate PAs with high power output, the integrity of the original signal must be sacrificed. The Doherty amplifier is a commonly used PA architecture which provides good power efficiency without distorting the original signal too much. However, this architecture lacks tuneability and thus lacks large broadband application.

Sheppard et al. have developed a broadband reconfigurable PA known as the Load Modulated Balanced Amplifier (LMBA) [1]. This device utilises a control signal on an isolated port in order to modulate the matching of the device which allows the amplifier's frequency of operation of be dynamic thus allowing greater bandwidth. The control signal is recombined with the output RF signal so as to not impact the efficiency of the PA. This technique allows for efficiencies of around 50% with greater bandwidth than standard Doherty PAs [2]. The LMBA has been further elaborated upon Collins et al. in the form of the Orthogonal LMBA which required lower power in the control signal than the standard LMBA [3].

Where this device lacks, however, is linearity. This parameter is crucial in order to keep the output signal faithful to the input. By applying a control signal into a balanced amplifier - as with the LMBA - it is hoped that linearity can be improved upon while conserving the LMBA's wideband power efficiency.

Initially, balanced Doherty amplifiers can be embedded into the OLMBA, replacing the balanced transistors. Through simulation and prototyping this design can be characterised, with a focus on capturing distortion and linearity - although power efficiency will remain an important criterion. From this, the benefits and drawbacks of...

This is one of 1,833 active United Kingdom Research Development opportunities most of your competitors will never see.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyEPSRC
CountryUnited Kingdom
CategoryResearch Development
PublishedSeptember 30, 2022
Procurement stageActive solicitation
Response dueSeptember 29, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedAugust 09, 2026

Source: UK Research and Innovation (UKRI) — Open Government Licence v3.0.

Related Opportunities in United Kingdom

An Integrative National Infrastructure for Ultra-High-Field NMR in the Physical and Life Sciences
"Using computer vision to monitor water quality by analysing complex particulates "
Super-resolution 3D ultrasound tomography for material microstructure characterisation
Bismuth-chalcohalide solar cells
Non-linear modelling of performance limiting MHD and disruptions in spherical tokamaks
Platform Driving The Ultimate Connectivity
Probing hydrodynamics of early development using diamond quantum sensors
Deciphering Reaction Mechanisms of Biomass Upgrading over Zeolitic Materials via Advanced Nuclear Magnetic Resonance (NMR) spectroscopy

See every United Kingdom Research Development opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United Kingdom Research Development intelligence report in your inbox

A personalized report on United Kingdom Research Development opportunities, emailed in 5-10 minutes. One per month, no account needed.