Improvement Works at Alajo Drain

World Bank -- Greater Accra Resilient and Integrated Development Project · Ghana government procurement

Bidding on World Bank-funded work in Ghana? Get new Ghana tenders by email, free: Set up alerts

Closed November 03, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

SPECIFIC PROCUREMENT NOTICE

Invitation for Bids (IFB)

Project: Greater Accra Resilient and Integrated Development Project

Contract title: Improvement Works at Alajo Drain

Country: Ghana

Credit No.: IDA-64100

RFB No: GH-MWH-219660-CW-RFB

Issued on: September 19, 2026

• The Government of Ghana has received financing from the World Bank toward the cost of the Greater Accra Resilient and Integrated Development Project and intends to apply part of the proceeds toward payments under the contract for the Improvement Works at Alajo Drain. For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing.
• The Ministry of Works, Housing and Water Resources invites sealed bids from eligible contractors for the improvement works at Alajo drain. The works involve two main interventions:

• The construction of a covered reinforced concrete culvert parallel to the Eastern Railway Line (Railway drain), aiming to improve flood management in the Alajo urban area. The new infrastructure consists of a 1,596-meter-long rectangular box culvert with internal dimensions of 5.00m by 2.00m, designed with a constant invert slope of 0.3% to ensure optimal hydraulic performance and prevent water stagnation.

The proposed drain alignment passes through densely urbanized areas, cultivated plots, and near existing structures, requiring the relocation or demolition of some buildings, careful excavation work including vertical sheet piling and retaining walls where needed, as well as connections with secondary drainage. Special attention is given to the crossing under the Eastern Railway Line, where the culvert will be placed at a depth of 1.4 meters to prevent interference with the rail infrastructure. The culvert discharges into the Odaw River with an outfall designed at a 45-degree angle to the river flow.

Secondary drainage connections are included, with...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- Greater Accra Resilient and Integrated Development Project
CountryGhana
CategoryEnvironmental
PublishedSeptember 14, 2026
Procurement stageRequest for Proposal (RFP)
ClosedNovember 03, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 22, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

More Open Opportunities in Ghana

Lta_engineering Consultancy Services for IOM-CSSM Infrastural Project Activities
Procurement of 44,100 pcs of play games materials for Early Childhood Education

See every Ghana Environmental opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Ghana Environmental intelligence report in your inbox

A personalized report on Ghana Environmental opportunities, emailed in 5-10 minutes. One per month, no account needed.