H312--Fire System Inspection & Testing

252-Network Contract Office 12 (36C252) · United States government procurement

Closed May 06, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

RESPONSE:

Per NFPA 25 13.4.5.2.2.2 a full trip test of dry systems is required every three years, and an air leakage test of dry systems every three years per NFPA 13.4.5.2.9.  for the following buildings.  Years for testing shall be Base Year FY26, and Option Year 3 FY29.
Building 14
Building 22/69
Building 49
Building 60
Building 128
Building 129
Building 130
Building 131
(This is in SOW, written this way, for the full dry trip test). 

(This is not in the SOW but NFPA 25 states)- 13.4.3.2.3- During the years when full flow testing in accordance with 13,4,4,2,2 is not required, the Preaction valve shall be trip tested with the control valve partially open.

As far as the quarterly, semi-annual, annual testing it would make no sense to do a quarterly test, then right after doing a semi-annual test, then right after doing an annual test performing the same test on the same visit.  Unless mistaken, there are no tests that would be a quarterly test, and a semi-annual test, and/or an annual test.


REQUEST FOR CLARIFICATION:

1. Inspection Frequency Overlap (Quarterly, Semi-Annual, Annual)
The CLIN structure appears to define inspection frequencies as separate and cumulative as follows:
Annual = 1 occurrence
Semi-Annual = 2 occurrences
Quarterly = 4 occurrences
However, per NFPA, these inspection intervals are not additive, but rather inclusive, where higher frequency inspections (quarterly) inherently satisfy the requirements of lower frequency intervals (semi-annual and annual).
Concern:
The current structure appears to require performance and pricing of:
4 quarterly inspections
PLUS 2 semi-annual inspections
PLUS 1 annual inspection
This results in 7 total inspection events annually, which exceeds NFPA requirements and standard industry practice. 
Per NFPA guidelines exclusively the following is the standard:
Fire Alarm Systems: 2 Inspections per year
Annual
Semi-Annual
Fire Sprinkler Systems: 4 Inspections per year
Annual
Quarterly 1
Semi-Annual
Quarterly...

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agency252-Network Contract Office 12 (36C252)
CountryUnited States
CategoryProgram Evaluation
NAICS561621
PSCH312
PublishedApril 28, 2026
Procurement stageActive solicitation
ClosedMay 06, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedAugust 27, 2026

Source: U.S. Government (SAM.gov) — public domain. GlobalGov is not affiliated with or endorsed by the United States Government.

Browse Similar Open Opportunities in United States

H342--PMI Svc, Fire Extinguishers - Base Plus Four (4) Option Years Base PoP: 11/1/25 - 10/31/26
Hydropower HSS In-depth Inspection Services RS Kerr and Broken Bow
Government Publishing Office FY26 Equipment Inspection
FIRE SUPPRESSION SYSTEMS
Lagoon Aeration
Laundry Chemical Supplies and Maintenance
Annual Testing and Certification of Weight Handling Equipment
PPVG GEN V Award

See every United States Program Evaluation opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free United States Program Evaluation intelligence report in your inbox

A personalized report on United States Program Evaluation opportunities, emailed in 5-10 minutes. One per month, no account needed.