The objective of the Second Phase of Green and Resilient Expansion of Energy Program Project for Kenya is to increase the capacity of Kenya Power System for energy trade and renewable energy integration. There are four components to the project, the first component being installation of system stabilization equipment. This component will finance installation of STATCOMs to improve the fault levels, increase voltage stability, and allow for greater import of cheaper and renewable energy from Ethiopia. One of the STATCOMs will be installed at the existing Suswa substation where the 500 HVDC Ethiopia-Kenya transmission interconnector terminates while the second STATCOM will be installed at 220/132kV Rabai substation at the coast region of Kenya. The second component is the construction of a 400kV Substation at Kimuka. The Kimuka substation will enable export of power from Ethiopia to Tanzania through Kenya by allowing the Suswa-Isinya line to be operated at full design capacity. The third component is the battery energy storage systems. Implemented by KenGen, the component will support the installation of the first BESS of up to 200MWh for load shifting renewable energy sources (primarily geothermal) but also grid stability by providing system reserves (both fast and backup reserves). The charging will occur during the off-peak period (between 10pm and 5am), while the provision of backup reserves peaks during the morning and evening hours (at 4am and 6pm). Finally, the fourth component is the technical assistance, capacity building and project management. This component includes five subcomponents: The solar auctions preparatory studies, The transaction advisory for solar auction (including legal and procurement), sector technical assistance, capacity building and project management, technical assistance to KETRACO, and technical assistance to KenGen.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | World Bank – IBRD |
|---|
| Country | Republic of Kenya |
|---|
| Category | Construction |
|---|
| Published | December 27, 2023 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | December 27, 2023 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | August 12, 2026 |
|---|
Source: The World Bank — Open Data, licensed CC BY 4.0.
See every Republic of Kenya Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Republic of Kenya Construction intelligence report in your inbox
A personalized report on Republic of Kenya Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.