Integrated Aquatic and Terrestrial Biodiversity Study at Naryn River (Kambarata-1 HPP)

World Bank -- Technical Assistance for Kambarata 1 Hydropower Plant Project · Kyrgyz Republic government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

September 24, 2026
Response Due
Active
Status

Opportunity Overview

Integrated Aquatic and Terrestrial Biodiversity Study on Naryn River (Kambarata-1 HPP) REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) Loan No./Credit No./ Grant No.: IDA Credit 7601-KG / Grant TF-C4773-KG Assignment Title: Integrated Aquatic and Terrestrial Biodiversity Study on Naryn River (Kambarata-1 HPP) Reference No . (as per Procurement Plan): KG/KA1/CS/2026/QCBS-04 The Cabinet of Ministers of the Kyrgyz Republic has received financing from the World Bank towards the cost of the Technical Assistance for Kambarata 1 Hydropower Plant Project, and intends to apply part of the proceeds for consulting services. The consulting services (“the Services”) include Integrated Aquatic and Terrestrial Biodiversity Study on Naryn River (Kambarata-1 HPP). The objectives of this assignment are to: 1. Detailed biodiversity surveys/assessments for the construction of the diversion tunnel, expected to start in summer 2027. This includes research on: (i) Baseline biodiversity studies of terrestrial ecosystems through systematic surveys of flora and fauna in activity impact zones (tunnel entrances, access roads, waste disposal sites, construction sites); (ii) Development of measures to compensate and reimburse damage to biodiversity in the event of significant negative impacts being identified in the bypass tunnel section; (iii) Identification and mapping of critical habitats and priority biodiversity sites within the bypass tunnel area. (iv) Analysis of construction activities and their impact on biodiversity. 2. Closing biodiversity gaps identified in the ESIA. This includes research on: (i) Aquatic Biodiversity (eDNA). Environmental DNA study is designed to establish a comprehensive biodiversity baseline using state-of-the-art environmental DNA (eDNA) methods and observational methods for aquatic ecosystems and traditional survey methods for terrestrial ecosystems, explicitly linked to: construction impact pathways and Environmental and Social...

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- Technical Assistance for Kambarata 1 Hydropower Plant Project
CountryKyrgyz Republic
CategoryEnvironmental
PublishedSeptember 10, 2026
Procurement stageSources Sought
Response dueSeptember 24, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedSeptember 20, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Related Opportunities in Kyrgyz Republic

Contract manager

See every Kyrgyz Republic Environmental opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Kyrgyz Republic Environmental intelligence report in your inbox

A personalized report on Kyrgyz Republic Environmental opportunities, emailed in 5-10 minutes. One per month, no account needed.