Opportunity Overview
Plant
Design, Supply and Installation
Two-envelope Bidding Process, Without Prequalification
Employer: Rural and Renewable Energy Agency
Project: Liberia Electricity Sector Strengthening and Access Project II (LESSAP II)
Contract title: Procurement of Design, Supply, Installation, and Operation and Maintenance (O&M) of Integrated Solar PV Streetlight System for Selected Roadways in Liberia
Country: Liberia
Loan No. /Credit No. / Grant No.: 76120/TF-C5131
RFB No: LR-RREA-532407-GO-RFB
Issued on: June 29, 2026
1. The Rural and Renewable Energy Agency has received financing from the World Bank toward the cost of the Liberia Electricity Sector Strengthening and Access Project II, and intends to apply part of the proceeds toward payments under the Contract for Procurement of Design, Supply, Installation, and Operation and Maintenance (O&M) of Integrated Solar PV Streetlight System for Selected Roadways in Liberia
“For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing, except for those payments, which the contract provides to be made through letter of credit.”
2. The Rural and Renewable Energy Agency now invites sealed Bids from eligible Bidders for the Design, Supply, Installation, and Operation and Maintenance (O&M) of Integrated Solar PV Streetlight System for Selected Roadways in Liberia. The implementation period shall be eight (8) months, comprising six (6) months for design, supply and installation, plus two (2) months for testing, commissioning, Inspection and Verification, and major/minor defect corrections, followed by twenty-four (24) months for warranty, after-sales service, and O&M. A margin of preference shall not be applicable to this contract.
3. Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start FreeSolicitation Details
| Issuing agency | World Bank -- Liberia Electricity Sector Strengthening and Access Project (LESSAP) Phase 2 |
|---|---|
| Country | Liberia |
| Category | Energy |
| Published | June 27, 2026 |
| Procurement stage | Request for Proposal (RFP) |
| Closed | August 10, 2026 |
| Status | Closed — no longer accepting responses |
| Official source | View original notice |
| Last verified | October 06, 2026 |
Source: The World Bank — Open Data, licensed CC BY 4.0.
See every Liberia Energy opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Get a free Liberia Energy intelligence report in your inbox
A personalized report on Liberia Energy opportunities, emailed in 5-10 minutes. One per month, no account needed.