Construction of the access road to the bridge over the Prut River, Ungheni, km 1+000 - km 1+410

World Bank -- Moldova Rural Connectivity Project · Moldova government procurement

Bidding on World Bank-funded work in Moldova? Get new Building Construction tenders there by email, free: Set up alerts

Closed September 08, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

Specific Procurement Notice

Request for Bids

Small Works

(One-Envelope Bidding Process)

Country: Republic of Moldova

Name of Project: Moldova Rural Connectivity Project

Contract Title: Construction of the access road to the bridge over the Prut River, Ungheni, km 1+000 - km 1+410

Loan No. 9672-MD/Credit No. 7538-MD

RFB Reference No.: MRCP/W6/01

• The Republic of Moldova has received financing from the World Bank toward the cost of the Moldova Rural Connectivity Project, and intends to apply part of the proceeds toward payments under the contract for Procurement of Construction works of the access road to the bridge over the Prut River, Ungheni, km 1+000 - km 1+410.
• The “National Road Administration” (NRA) now invites sealed Bids from eligible Bidders for the execution of the construction works under Contract MRCP/W6/01, including all necessary activities for the construction of the access road to the bridge over the Prut River, such as earthworks, pavement construction, drainage works, road safety facilities, road markings, traffic signs, utility relocation and protection, environmental protection measures, and all other works specified in the Bill of Quantities and Technical Specifications.

The Scope of Works includes, but is not limited to, the following major quantities:

• Over 333.300 m³ of earthworks;
• Over 16.800 m³ of soil improvement at the base of the embankment;
• Over 16.200 m³ of granular drainage layer;
• Over 104.000 m² of geogrid and geocomposite reinforcement;
• Over 4.000 tonnes of asphalt mixtures;
• Over 18 m of reinforced concrete box culvert;
• Over 2.400 m of paved waterways;
• Over 1.800 m of guardrail installation;
• Over 100 of traffic signs;
• Over 1.600 m² of road markings (cold-applied two-component material).

Utilities constructions and rearrangements:

• Over 1.900 m of road lighting;
• Over 4.000 m of communication lines;
• Over 100 m of water supply network relocation

• Bidding will be conducted through national...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- Moldova Rural Connectivity Project
CountryMoldova
CategoryBuilding Construction
PublishedJuly 24, 2026
Procurement stageRequest for Proposal (RFP)
ClosedSeptember 08, 2026
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 22, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

More Open Opportunities in Moldova

Moldova – Petroleum products, fuel, electricity and other sources of energy – Petroleum products for 2027
Moldova – Fuels – Petroleum products for the year 2027
Moldova – Animal products, meat and meat products – Assorted meat for the year 2027
Moldova – Cleaning services – Cleaning services for 2027
Moldova – Engineering design services – Design services for "Construction of the Building Complex for IP USMF "Nicolae Testemițanu" at 18/13 N. Testemițanu St., Chișinău city" (stage I)

See every Moldova Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Moldova Building Construction intelligence report in your inbox

A personalized report on Moldova Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.