Montenegro – Wastewater treatment plant construction work – Construction of the wastewater treatment plant, wastewater collection system and implementation of water supply priority measures in the Municipality of Kolašin

Municipality of Kolašin · Montenegro government procurement

Get new Montenegro Building Construction tenders by email, free: Set up alerts

This opportunity is now closed. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$10.5M
Est. Value
Closed
Status

Opportunity Overview

The indicative scope of works covers the following elements: 1. Sewerage network: Construction of sewerage network in the approximate length of 9.2 km which will serve to 3000 inhabitants in the following settlements: Kolašin city centre, Braće Vujisić (Dulovina), Breza and partly Smailagića Polje and Gornji Pažanj. 2. Water supply priority measures: Water supply priority measures include services, supplies and construction works to be designed, supplied, installed and constructed by the Contractor. - Preparatory services (operational GIS, HID based hydraulic model, leakage detection for 30 km of network and detailed design of new elements including SCADA) - Supply, installation and commissioning of bulk flowmeters, and water meters (400), establishment of DMAs and SCADA - Works for upgrade of the water distribution system hydraulic configuration. 3. Wastewater Treatment Plant Design and Construction of WWTP in Bakovići settlement - Conventional Activated Sludge Process and aerobic sludge stabilization. Design and construction of the WWTP shall include two phases: Phase I - 4000 PE (to be constructed): Wastewater flowrate (including infiltration) = 765 m³/d (9 l/s); Peak dry weather flow = 57 m³/h (16 l/s); Peak wet weather flow to =109 m³/h. Phase II - additional 2000 PE (to be considered in design): Wastewater flowrate (including infiltration= 1045 m³/d (12 l/s); Peak dry weather flow = 77 m³/h (21 l/s); Peak wet weather flow = 150 m³/h The proposed process for WWTP includes: Influent pipe and by-pass line, inlet chamber, Coarse screens, Fine screens, Aerated grit chamber, Distribution chamber, Primary sedimentation, activated sludge and secondary sedimentation (biological) treatment, Effluent control and measurement chamber, Discharge line to the Tara River, Sludge pumping station, Sludge distribution chamber, Sludge thickener, Sludge reed beds, Drainage pumping station, Building for guard, laboratory, blowers, warehouse, Odour control, Plant infrastructure,...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyMunicipality of Kolašin
CountryMontenegro
CategoryBuilding Construction
Estimated value$10.5M
PublishedAugust 31, 2026
Procurement stageSolicitation
ClosedClosing date not published
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 22, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

More Open Opportunities in Montenegro

Montenegro – Firefighting, rescue and safety equipment – Procurement of firefighting equipment
Development of a National Strategy and Implementation Roadmap for Montenegro's Participation in Euro system TARGET Services
Call for External Collaborators - Analysis of the Montenegro responses to the 2025 ILO Women in Business and Management enterprise survey - DWT/CO Budapest

See every Montenegro Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Montenegro Building Construction intelligence report in your inbox

A personalized report on Montenegro Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.