Opportunity Overview
AD Elektrani na Severna Makedonija, vo drzhavna sopstvenost, Skopje - Republic of North Macedonia
Project: Bitola Gas-Fired Combined Heat and Power Plant and District Heating Network Expansion Project
Grant Facility for Project Preparation (GFPP) Grant No.: TF0D2151
Assignment Title: Project Preparation for Bitola Gas-Fired Combined Heat and Power (CHP) Plant and District Heating Network Expansion
Reference No. (as per Procurement Plan): MK-ESM-563220-CS-QCBS
The AD Elektrani na Severna Makedonija, vo drzhavna sopstvenost, Skopje (“Recipient”) has received financing from the World Bank toward the cost of the Bitola Gas-Fired Combined Heat and Power Plant and District Heating Network Expansion Project, and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include preparation of the Feasibility studies for the development of the “Bitola Gas-Fired Combined Heat and Power (CHP) Plant and District Heating Network Expansion” Project. It is expected that the commencement of activities by the Consultants for all studies will be at the beginning of year 2027 and is estimated to be completed within 12 months. The Consultant shall mobilize within fifteen (15) working days after Contract signing.
The Activities for which the Grant is provided consist of the following parts:
• Technical and Economic Preparation
Carrying out pre-investment studies to confirm the feasibility of the Project including:
(i) a feasibility study and basic design for the Bitola gas-fired CHP plant and its gas pipeline connection (as well as associated facilities such as grid connection), including assessment of optimal capacity, technology options, fuel supply assumptions, heat offtake, and system integration. The feasibility study would assess use of existing infrastructure in Bitola;
(ii) a feasibility study and technical designs for the expansion of the Bitola district...
This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.
Start FreeSolicitation Details
| Issuing agency | World Bank -- Preparation for Bitola Gas-Fired Combined Heat and Power (CHP) Plant and District Heating (DH) |
|---|---|
| Country | North Macedonia |
| Category | Energy |
| Published | August 04, 2026 |
| Procurement stage | Sources Sought |
| Closed | August 10, 2026 |
| Status | Closed — no longer accepting responses |
| Official source | View original notice · Get alerts for tenders like this |
| Last verified | November 22, 2026 |
Source: The World Bank — Open Data, licensed CC BY 4.0.
More Open Opportunities in North Macedonia
See every North Macedonia Energy opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Your 14-Day Free TrialFree 14-day trial · cancel anytime
See who is already competing here →Get a free North Macedonia Energy intelligence report in your inbox
A personalized report on North Macedonia Energy opportunities, emailed in 5-10 minutes. One per month, no account needed.