Construction of Mandalgobi-Arvaikheer 220kV Double-Circuit Transmission Line (287 km) - (Three lots)

World Bank -- Fourth Energy Sector Project · Mongolia government procurement

Bidding on World Bank-funded work in Mongolia? Get new Building Construction tenders there by email, free: Set up alerts

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

December 11, 2026
Response Due
Active
Status

Want more tenders like this one?

We will email you a free list of open Building Construction tenders in Mongolia, usually within 10 minutes. No account needed.

Opportunity Overview

Specific Procurement Notice – Initial Selection Document (ISD)

Invitation for Initial Selection

Plant

(Design, Supply, and Installation)

Procurement of:

Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV (287 km) Double-Circuit Transmission Line, in Three Lots

Employer: Ministry of Energy of Mongolia (MOE)

Project: Fourth Energy Sector Project (ESP4)

Contract title: Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV (287 km) Double-Circuit Transmission Line, in Three Lots

Country: Mongolia

Loan No.: IBRD Loan No. 9873-MN

RFB No: MN-MOE-ESP4-1-CW-RFP

Issued on: 29 October 2026

• The Government of Mongolia has applied for financing from the World Bank toward the cost of the Fourth Energy Sector Project (P509161) and intends to apply part of the proceeds toward payments under the contracts for “Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220 kV Double-Circuit Transmission Line (287 km), in Three Lots”.
• The Ministry of Energy intends to initially select Applicants for Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220kV Double-Circuit Transmission Line (287 km), in Three Lots.

CONTRACT DESCRIPTION

CONTRACT PERIOD

Design Verification, Update and Construction of Mandalgobi - Arvaikheer 220kV Double-Circuit Transmission Line (287 km), in Three Lots

Lot 1: Tower No.1 to Tower No. 288

Lot 2: Tower No.289 to Tower No. 580

Lot 3: Tower No.581 to Tower No. 868

Time for Completion:

24 months

(Design Verification, Update and Construction) for each lot (Lot 1, Lot 2 and Lot 3)

Defect notification period:

36 months

Applicants are expected to have the following minimum requirements:

A. For International Applicants

Item

Qualification Criteria

(US$ million)

Lot 1

Lot 2

Lot 3

For Multiple Lots

Minimum average annual turnover in Plant Design, and/or Supply and/or Installation within the last 3 years (2023, 2024 and...

How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.

Bidding on this? Book 15 minutes with us and we will pull the documents, past awards and a translation for this tender live with you. Book a walkthrough

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, cancel anytime.

Start a free GlobalGov account

Solicitation Details

Issuing agencyWorld Bank -- Fourth Energy Sector Project
CountryMongolia
CategoryBuilding Construction
PublishedOctober 29, 2026
Procurement stageRequest for Proposal (RFP)
Response dueDecember 11, 2026
StatusOpen — accepting responses
Official sourceView original notice Track this tender
Last verifiedNovember 22, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

More Opportunities in Mongolia

Package 6: Last Mile Connectivity 14.7 km New Road Construction Works in Esunzuil Soum, Uvurkhangai Province (Re-tendering)
Re-advertisement: Call for national consultant to conduct preliminary needs assessment, update existing gap analysis and assess the implications of ratifying the ILO Convention No.187
IC/2026/124- Fiscal Risk Management and Modelling Senior Consultant (National)
IC/2026/123 - Junior PFM Consultant (National)

See every Mongolia Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →