Feasibility studies, concept design and Environmental and Social Impact Assessment for upgrading/or rehabilitation of selected roads in Niassa province Lot II

World Bank -- Climate Resilient Roads for the North Project · Mozambique government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

October 07, 2026
Response Due
Active
Status

Opportunity Overview

REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES - FIRMS SELECTION) Country: Mozambique Name of Project: Climate Resilient Roads for the North (CRRN - P500488) Grant No.: E315-MZ Assignment Title: Consultancy Services for Preparation of Feasibility Study, Conceptual design, Environmental and Social Impact Assessment and bidding documents for Civil Works under Design, Build and Transfer Methodology for the Roads N361: Lichinga – Lago Niassa (98.0 km), and R733/R1211/R1215 Lussimbesse – Matchedje (206 km) in Niassa Province” Reference No: 47A003041/CP/ 28/2026 Client : National Roads Administration/ Administração Nacional de Estradas,IP (ANE, IP) 1. The Government of Mozambique (GoM) has received financing from the World Bank towards the cost of the Climate Resilient Roads for the North (CRRN), and intends to apply part of the proceeds for Consultancy Services for Preparation of Feasibility Study, Conceptual design, Environmental and Social Impact Assessment and bidding documents for Civil Works under Design, Build and Transfer Methodology for the Roads N361: Lichinga – Lago Niassa (98.0 km), and R733/R1211/R1215 Lussimbesse – Matchedje (206 km) in Niassa Province, hereafter designated the “Services”. 2. The objectives of the Services are: a) To prepare a feasibility study and Conceptual design based on international standards and concept engineering designs, which will be a basis for a prospective contractor to develop detailed engineering designs; b) To prepare the ESIA for the road project sites to ensure the project conceptual design incorporates the mitigation measures for the potential negative impacts and maximizes the positive impacts of the project in a manner consistent with all applicable requirements of the World Bank Group Environmental and Social Framework (ESF) and the relevant national laws. 3. The Terms of Reference (ToR) can be obtained through the following link...

This is one of 5 active Mozambique Environmental opportunities most of your competitors will never see.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyWorld Bank -- Climate Resilient Roads for the North Project
CountryMozambique
CategoryEnvironmental
PublishedSeptember 10, 2026
Procurement stageSources Sought
Response dueOctober 07, 2026
StatusOpen — accepting responses
Official sourceView original notice
Last verifiedSeptember 20, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Related Opportunities in Mozambique

Environmental Safeguards Specialist

See every Mozambique Environmental opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Mozambique Environmental intelligence report in your inbox

A personalized report on Mozambique Environmental opportunities, emailed in 5-10 minutes. One per month, no account needed.