FEDERAL REPUBLIC OF NIGERIA FEDERAL MINISTRY OF WATER RESOURCES AND SANITATION S USTAINABLE POWER AND IRRIGATION FOR NIGERIA(SPIN) PROJECT Country: Nigeria Project ID No: P 179684 IDA Credit No: IDA76370 Assignment Title: CONSULTANCY SERVICES FOR DESIGN REVIEW, DETAILED ENGINEE R ING DESIGN, AND CONSTRUCTION SUPERVISION FOR THE REHABILITATION OF KAMPE-OMI DAM AND DUKKU LADE WEIR IN KOGI AND KWARA STATES Reference No . FMWR&S/SPIN/QCBS/CS/2026/19B The Federal Government of Nigeria (FGN), through the Federal Ministry of Water Resources and Sanitation (FMWRS) is currently implementing the Sustainable Power and Irrigation for Nigeria (SPIN) Project with a credit received from the International Development Association (IDA) and it intends to apply part of the proceeds for consulting services. The SPIN Project is designed to strengthen dam safety and improve the management of water resources for hydropower, irrigation, flood management and climate resilience in selected areas of Nigeria. The Federal Government of Nigeria is undertaking the rehabilitation and safety improvement of selected federal dams and associated hydraulic appurtenances, including detailed engineering design, preparation of rehabilitation measures, and construction supervision services to enhance structural integrity, operational reliability, and long-term climate resilience. The objective of the Assignment: The overall objective of the assignment is to undertake design review, producing the design and engineering drawings, technical specifications, works requirements, and the bill of quantities and construction supervision for the rehabilitation of Kampe Omi and Duku-Lade Wier and associated hydraulic appurtenances. The Consultant shall review and utilize the findings, conclusions and recommendations of the Dam Safety Review Panel of Experts (DSRPoE) Dam Safety Assessment Reports as the technical basis for the assignment. The detailed Terms of Reference (TOR) for the Consultancy Services can be found...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | World Bank -- Sustainable Power and Irrigation for Nigeria Project |
|---|
| Country | Nigeria |
|---|
| Category | Building Construction |
|---|
| Published | August 24, 2026 |
|---|
| Procurement stage | Sources Sought |
|---|
| Closed | September 16, 2026 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | September 22, 2026 |
|---|
Source: The World Bank — Open Data, licensed CC BY 4.0.
See every Nigeria Building Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Nigeria Building Construction intelligence report in your inbox
A personalized report on Nigeria Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.