The development objective of the Electricity Transmission Project for Nigeria is to increase the transfer capacity of the transmission network in Nigeria. There are two project components. First component, Transmission network strengthening and improvement (US 408 million dollars equivalent, of which the Federal Government of Nigeria (FGN) US 4 million dollars and IDA and IDA Scale-Up Facility (SUF) US 404 million dollars equivalent, excluding contingency).This component has four sub components: (a) the upgrading and rehabilitation of up to 48 existing substations—of these, approximately 11 require the replacement of transformers, while the others require the addition (not the replacement) of transformers, and addition and replacement of protection and control systems, switchgear, and associated equipment; (b) replacement of conductor on up to 13 132 kV transmission lines and conversion of up to two 132 kV lines from single circuit to double circuit (the total length of the transmission lines is about 1,260 km); (c) the upgrading and expansion of the network’s Supervisory Control and Data Acquisition (SCADA) and telecommunication systems and construction of four regional control centers; and (d) installation of static var compensator (SVC) at the remotely located Gombe substation in the northeast, which is supplied by a long 132 kV line, and purchase of spare equipment. Second component, Capacity building and technical assistance (IDA and IDA SUF US 32 million dollars equivalent, excluding contingency).This component includes the following activities: (a) consulting services (transaction advisory to support the preparation of transaction documents and procurement of a sponsor i.e. private developer) for a pilot Public-Private Partnership (PPP) for transmission infrastructure that is part of network expansion (that is, greenfield infrastructure); (b) consulting support and capacity building to improve the Transmission Company of Nigeria (TCN) PMU’s performance; (c)...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | World Bank – IBRD |
|---|
| Country | Federal Republic of Nigeria |
|---|
| Category | Power Transmission |
|---|
| Published | February 15, 2018 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | February 15, 2018 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | August 12, 2026 |
|---|
Source: The World Bank — Open Data, licensed CC BY 4.0.
See every Federal Republic of Nigeria Power Transmission opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Federal Republic of Nigeria Power Transmission intelligence report in your inbox
A personalized report on Federal Republic of Nigeria Power Transmission opportunities, emailed in 5-10 minutes. One per month, no account needed.