The objectives of the Sindh Barrages Improvement Project for Pakistan are to improve the reliability and safety of the Guddu barrage and strengthen the Sindh Irrigation Department’s capacity to operate and manage the barrage. There are three components to the project, the first component being rehabilitation of the Guddu barrage. This component will support rehabilitation of the barrage and its associated structures. The component will finance: concrete repairs along the upstream gate grooves and rehabilitation of both fish ladders; removal of the left pocket dividing wall and construction of a new left pocket dividing wall to widen the left pocket and improve its ability to reduce the quantities of sediment entering the Ghotki feeder canal; and river training works through construction of a left-bank spur to promote favorable river approach conditions to the barrage and strengthen the upstream existing river training works. The second component is the improved barrage operation. This component will support the establishment of the BMO and modernization and improvements to the barrage O&M. Institutionally this will include undertaking a study to design the BMO structure, defining roles and responsibilities, and moving towards a more service oriented culture. Technically the Bank will finance necessary upgrades to the monitoring instrumentation, such as piezometers, gate positioning and water measurement equipment, replacement of surveillance and maintenance boats, and procurement of hydrographic equipment. The project will support workshops and provide a stock of spare parts, for use in maintenance activities. The instrument monitoring system for the barrage will be renovated, and the operations staff will be equipped with an updated operation, maintenance, and surveillance manual. Finally, the third component is the project management, monitoring, and evaluation. This component will support the coordination of all project-related activities as well as training and...
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | World Bank – IBRD |
|---|
| Country | Islamic Republic of Pakistan |
|---|
| Category | Construction |
|---|
| Published | June 19, 2015 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | June 19, 2015 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | August 12, 2026 |
|---|
Source: The World Bank — Open Data, licensed CC BY 4.0.
See every Islamic Republic of Pakistan Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Islamic Republic of Pakistan Construction intelligence report in your inbox
A personalized report on Islamic Republic of Pakistan Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.