[pl] The contract is for the delivery, under a “design and build” arrangement, of the project entitled “Construction of a high-efficiency gas-fired cogeneration source with a capacity of 4,3 MWe at the C1 Heating Plant, together with associated infrastructure”. The contract includes the design, construction, supply, installation, commissioning, testing and handover for operation of a complete high-efficiency gas-fired cogeneration source comprising two Cogeneration Units, each with a gross electrical output of 2,15 MWe, i.e. 4,30 MWe in total, together with complete process and auxiliary installations. The scope includes in particular construction of the cogeneration source building; supply and installation of the cogeneration units, heat recovery systems, gas and flue gas installations, a Heat Pump system using heat from the LT circuits and flue gas condensation, heating, electrical and power installations, instrumentation, control and automation (AKPiA), automation, control systems and SCADA, as well as connection of the designed source to the existing infrastructure of the C1 Heating Plant. Each Cogeneration Unit must achieve a gross electrical output of 2,15 MWe and useful thermal output from the primary HT + flue gas recovery system of at least 2,0 MWt. The combined useful thermal output of both units from the primary recovery system is at least 4,0 MWt. The contract also includes Start-up, Final Tests, a 72-hour Trial Run, Guarantee Measurements, training, delivery of documentation, and scheduled inspections and servicing of the Cogeneration Units for at least 24 months from the date of Final Acceptance and no less than until each unit has reached 16 000 mth inclusive. For the Heat Pumps and other process equipment covered by a 36-month Quality Guarantee period, Service includes scheduled inspections and servicing required by the manufacturer for 36 months from the date of Final Acceptance. The works will be carried out at the operating C1 Heating Plant,...
This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.
Start Free| Issuing agency | Elektrociepłownia Piotrków Trybunalski Sp. z o.o. |
|---|
| Country | Poland |
|---|
| Category | Building Construction |
|---|
| Estimated value | $8.6M |
|---|
| CPV | 45251000 |
|---|
| Published | October 09, 2026 |
|---|
| Procurement stage | Request for Proposal (RFP) |
|---|
| Closed | November 16, 2026 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Original language | Polish — members read it in their own language |
|---|
| Official source | View original notice · Get alerts for tenders like this |
|---|
| Last verified | November 28, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Poland Building Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Your 14-Day Free TrialFree 14-day trial · cancel anytime
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Poland Building Construction intelligence report in your inbox
A personalized report on Poland Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.