Project for Integrated Urban and Tourism Development (PIUTD)

World Bank – IBRD · Republic of Albania government procurement

Closed November 15, 2016. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

The development objective of the Integrated Urban and Tourism Development Project for Albania is to improve urban infrastructure, enhance tourism assets, and strengthen institutional capacity to support tourism-related local economic development in selected areas in the south of Albania. The project comprises of four components. The first component, urban upgrading and infrastructure improvement will finance the upgrading of infrastructure in selected municipalities by: (a) preparing of feasibility studies and designs (including urban design studies); (b) carrying out construction works to restore selected heritage buildings; (c) upgrading public spaces, the street network, and associated infrastructure; and (d) conducting construction supervision. The second component, touristic sites upgrading will finance investments aimed at improving selected touristic sites along the south of the Albania touristic corridor by inter alia: (a) restoring of selected heritage and cultural assets and creating rest stops or viewpoints; (b) repairing and improving site infrastructure such as pedestrian’s pathways; (c) preparing the required feasibility studies, site management plans, engineering designs; and (d) conducting construction supervision. The third component, tourism market and product development will: (a) strengthening the capacity of municipalities to deliver municipal services through inter alia: (i) provision of asset management systems, geographic information systems, and solid waste collection equipment; and (ii) establishment of site management capacity to enhance the operation of rehabilitated assets. The fourth component, implementation support will provide support to carry out project implementation, including maintenance of the project monitoring and evaluation system, as well as training and financing of incremental operating costs.

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyWorld Bank – IBRD
CountryRepublic of Albania
CategoryConstruction
PublishedNovember 15, 2016
Procurement stageActive solicitation
ClosedNovember 15, 2016
StatusClosed — no longer accepting responses
Official sourceView original notice
Last verifiedAugust 12, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

Browse Similar Open Opportunities in Republic of Albania

RFQ Construction Works for the improvement of Outdoor Sport Fields at: “George S
Technical Assistance to support day to day management of UK Utilities, mainly on technical and financial issues
Rehabilitation/Construction of Group B1 Bridges (Drithas, Turan, Selenica 1, 2, 3, and Selenica 4)
Rehabilitation Works of Murrashi Bridges
EU4GE WED Digital Economy Assessment
SALE OF SURPLUS OSCE PRESENCE IN ALBANIA VEHICLES
Design, Co-Ordination and Delivery of Mock Trial Training on Combating Trafficking in Human Beings
National consultant for capacity building of teachers in Peace Education

See every Republic of Albania Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Republic of Albania Construction intelligence report in your inbox

A personalized report on Republic of Albania Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.