Romania – Bridge construction work – Lucrări de execuție aferente obiectivului de investiții ”Amenajare urbană spațiu public urban Podul Calicilor și Cheiul Dâmboviței între Piața Unirii și Pod Izvor”: OBIECT 1 - Spațiu public urban Podul Calicilor - Ansamblu urban Domnița Bălașa, Parcaj subteran, amenajare urbană Palatul de Justiție OBIECT 2 - Proiect „Cheiul Dâmboviței Unirii-lzvor”, Splaiul Independenței - Pod Unirii - Pod Izvor

Municipiul Bucuresti · Romania government procurement

Get new Romania Building Construction tenders by email, free: Set up alerts

Closed October 01, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$14.1M
Est. Value
Closed
Status

Opportunity Overview

Lucrări de execuție aferente obiectivului de investiții ”Amenajare urbană spațiu public urban Podul Calicilor și Cheiul Dâmboviței între Piața Unirii și Pod Izvor” in conformitate cu cerintele documentatiei de atribuire, cuprinde 2 obiecte: OBIECT 1 - Spațiu public urban Podul Calicilor - Ansamblu urban Domnița Bălașa, Parcaj subteran, amenajare urbană Palatul de Justiție, valoare estimata 9.713.416,10 lei fără TVA; OBIECT 2 - Proiect „Cheiul Dâmboviței Unirii-lzvor”, Splaiul Independenței - Pod Unirii - Pod Izvor, valoare estimata 54.251.215,15 lei fără TVA; Total valoare estimata obiectiv 1 si 2 = 63.964.631,25 fara TVA. Durata totală de execuție a contractului de lucrări este de 18 de luni. Termenele individuale de execuție, stabilite distinct pentru fiecare obiect în parte, sunt următoarele: • Obiect 1 Podul Calicilor – legătura dintre străzile Șelari și Sfinții Apostoli va fi executat într-un termen de 10 de luni, la expirarea căruia, începând cu data semnării Procesului-verbal de recepție la terminarea lucrărilor de către toate părțile implicate, curge o perioadă de garanție 36 de luni, în conformitate cu prevederile legislației în vigoare; • Obiect 2 Amenajare urbană Cheiul Dâmboviței între Piața Unirii și Pod Izvor va fi executat într-un termen de 18 luni, la expirarea căruia, începând cu data semnării Procesului-verbal de recepție la terminarea lucrărilor de către toate părțile implicate, curge o perioadă de garanție de 36 de luni, în conformitate cu prevederile legislației în vigoare. Executarea contractului începe în baza ordinelor administrative de începere emise de către Achizitor pentru fiecare obiect în parte. Contractul se consideră încheiat după efectuarea Recepțiilor finale pentru lucrările executate pe fiecare obiect în parte, conform Graficelor de execuție.

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyMunicipiul Bucuresti
CountryRomania
CategoryBuilding Construction
Estimated value$14.1M
PublishedAugust 27, 2026
Procurement stageSolicitation
ClosedOctober 01, 2026
StatusClosed — no longer accepting responses
Original languageRomanian — members read it in their own language
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 28, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Romania

Romania – Railway construction works – Sequential Replacement of Railway Superstructure Elements to Remove Speed Restrictions on Line 316 (Reghin–Târgu Mureș–Luduș, km 249+100–323+400) for Metropolitan Mureș Train Service Project – SRCF Brașov
Romania – Railway construction works – Sequential replacement of railway superstructure elements to remove speed restrictions on line 316 (Reghin–Târgu Mureș–Luduș, km 249+100–323+400) for the Introduction and development of Metropolitan Mureș train services – SRCF Brașov
Romania – Hospital facilities construction work – Design, construction and equipment services for the Buftea Obstetrics‑Gynecology Hospital project, including demolition of existing buildings (C1‑C15), relocation of oxygen station and water utilities
Romania – Railway construction works – “Rehabilitation of the Roman - Iași - Border railway line” - Phase 1. Electrification of the Iași - Border line (design and execution)
Romania – Railway construction works – "Rehabilitation of the Roman - Iași - Border railway line" - Phase 1. Electrification of the Iași - Border line (design and execution)

See every Romania Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Romania Building Construction intelligence report in your inbox

A personalized report on Romania Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.