Romania – Construction work for highways, roads – Proiectare si Executie lucrari pentru realizarea obiectivului de investitii: Pasaj de legatura intre DN1C si Parcul Industrial Tetarom III.

Compania Nationala DE Administrare A Infrastructurii Rutiere S.a. Prin D.r.d.p. Cluj · Romania government procurement

Get new Romania Building Construction tenders by email, free: Set up alerts

This opportunity is now closed. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$13.3M
Est. Value
Closed
Status

Opportunity Overview

Ob. contractului consta in prestarea serviciilor de expropiere si de proiectare , precum si Executia lucrarilor pentru realizarea obiectivului de investitii: Pasaj de legatura intre DN1C si Parcul Industrial Tetarom III. AC isi rezerva dreptul de a modifica contractul potrivit art.221 din Legea 98/2016, cu cond. ca aceste modificari sa nu se incadreze in prevederile art.221 alin.7 din Legea 98/2016, adica nu reprezinta o modificare substantiala. Clauze de revizuire conf. art. 221 alin. (1) lit. a) din Legea 98/2016, care anticipează eventualele modificări ce pot interveni în derularea contractului sunt : • Ajustarea preturilor conform cl. 48 din prezentul Acord contractual prin aplic. formulei de ajustare a preturilor mentionata in art. 31 din OUG 64/2022 privind ajustarea preturilor si a valorii devizelor generale in cadrul proiectelor finantate din fonduri externe nerambursabile (art. 221 alin. (1) lit. a). • Inlocuirea Antreprenorului: 1)Atunci cand Antr. este înlocuit de un nou Antr., in cond. prev. art. 221 alin. (1) lit. d) pct. i) din Legea 98/2016, numai in sit. in care respectiva inlocuire nu presupune mod. substantiale ale contr. : In cazul in care Antr. intampina dificultati in implementare (contractul nu se deruleaza in mod corespunzator de catre antreprenor sau sunt inregistrate intarzieri in activitatile de executie a lucrarilor, din motive ce tin exclusiv de culpa Antr., indiferent daca este culpa unui op.ec. din cadrul asocierii sau culpa asocierii in integralitate) sau este in imposibilitatea derularii contractului, tertul sustinator introdus in oferta si nominalizat in contract va prelua indeplinirea oblig. contr. conf. celor asumate la nivelul angajamentului ferm, anexa la contract, fara ca prin aceasta sa se reduca, extinda sau sa se elimine oblig. si respons. stipulate in contractual initial si fara a fi afectat caracterul general al acestuia; 2)Atunci când Antr. este înlocuit de un nou Antr. in cond. prev. art. 221 alin. (1) lit. d) pct. ii)...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyCompania Nationala DE Administrare A Infrastructurii Rutiere S.a. Prin D.r.d.p. Cluj
CountryRomania
CategoryBuilding Construction
Estimated value$13.3M
PublishedSeptember 01, 2026
Procurement stageSolicitation
ClosedClosing date not published
StatusClosed — no longer accepting responses
Original languageRomanian — members read it in their own language
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 27, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Romania

Romania – Railway construction works – Sequential Replacement of Railway Superstructure Elements to Remove Speed Restrictions on Line 316 (Reghin–Târgu Mureș–Luduș, km 249+100–323+400) for Metropolitan Mureș Train Service Project – SRCF Brașov
Romania – Hospital facilities construction work – Design, construction and equipment services for the Buftea Obstetrics‑Gynecology Hospital project, including demolition of existing buildings (C1‑C15), relocation of oxygen station and water utilities
Romania – Railway construction works – “Rehabilitation of the Roman - Iași - Border railway line” - Phase 1. Electrification of the Iași - Border line (design and execution)
Romania – Railway construction works – "Rehabilitation of the Roman - Iași - Border railway line" - Phase 1. Electrification of the Iași - Border line (design and execution)
Romania – Building construction work – Design and execution services for PT+DDE, including designer technical assistance, equipment provision and construction of the ‘Therapeutic Basins Treatment Facility and Associated Medical Spaces’ investment

See every Romania Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Romania Building Construction intelligence report in your inbox

A personalized report on Romania Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.