SI DESIGN AND CONSTRUCTION OF THE “Craiova–Filiasi HighwaySIFiliasi–Târgu Jiu Expressway—Section 4”

Original title (Romanian): Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”

Compania Nationala DE Administrare A Infrastructurii Rutiere S.a. · Romania government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$546.9M
Est. Value
August 31, 2026
Response Due
Active
Status

Opportunity Overview

Obiectul contractului il reprezinta proiectarea si executia Lotului 4 al obiectivului de investitii „Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu”, in lungime de aproximativ 22,925 km, din care 5,103 km la profil de Autostrada si 17,822 km la profil de Drum Expres, in conformitate cu prevederile contractului de lucrari. In conformitate cu prevederile contractuale, respectiv ale H.G. nr.1/2018, eventualele modificari care pot interveni in perioada de derulare a contractului, se refera la urmatoarele, fara a se limita la acestea: 1. Modificari ale partilor contractante, inclusiv inlocuirea contractantului cu un nou contractant in conditiile prevazute la art. 221 alin. (1) lit. d), punctul (ii); 2. Schimbarea denumirii si/sau a formei societatii, schimbari care nu atrag crearea unei persoane juridice noi; 3. Modificari care rezulta din adaptarea Proiectului Tehnic de Execuție la realitatea din teren, inclusiv schimbări de soluții tehnice punctuale; 4. Modificari care rezulta din modificări/adaptări ale cotelor, pozițiilor și/ sau dimensiunilor unor lucrari ca urmare a situatiei din teren; 5. Modificari generate de cerinte ale autoritatilor de mediu; 6. Modificari care rezulta din necesitatea mutarii/stramutarii unor obiecte aflate pe/in sol/subsol; 7. Modificari generate de includerea de noi subcontractanti/ furnizori/ subcontractanții subcontractanților/ orice alți operatori economici si/sau generate de inlocuirea subcontractantilor/ furnizorilor/ subcontractanții subcontractanților/ orice alți operatori economici initiali, care se vor realiza conform clauzei corespunzatoare din Conditiile Generale ale Contractului; 8. Modificari generate de schimbarea personalului cheie/alt personal, care se vor realiza conform clauzei corespunzatoare din Conditiile Generale ale Contractului; 9. Modificari ale culoarului/coridorului de expropriere care conduc la necesitatea realizarii de lucrari suplimentare si/sau la renuntarea realizarii unor lucrari existente...

This is one of 477 active Romania Construction opportunities most of your competitors will never see.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyCompania Nationala DE Administrare A Infrastructurii Rutiere S.a.
CountryRomania
CategoryConstruction
Estimated value$546.9M
PublishedAugust 13, 2026
Procurement stageRequest for Proposal (RFP)
Response dueAugust 31, 2026
StatusOpen — accepting responses
TranslationTranslated from Romanian by GlobalGov’s translation pipeline
Official sourceView original notice
Last verifiedAugust 26, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Related Opportunities in Romania

SI DESIGN AND CONSTRUCTION OF THE “Craiova–Filiasi HighwaySIFiliasi–Târgu Jiu Expressway—Section 4”
Design and Construction of the A1 Interchange (km 326+155)–DJ704 (Cugir)
Design and Construction of the A1 Interchange (km 326+155)–DJ704 (Cugir)
Services for the development and implementation of an IT solution, including the provision of equipment and core software as part of the “Electronic Road Tolling System” project, Lot 2—Control Objectives
Procurement and Transportation of LED Lighting Devices for Signaling Curves and Hazardous Sections
Procurement and transportation of LED lighting devices for signaling curves and hazardous sections
Lighting System to Improve Road Safety PE in Hazardous Areas
Lighting System to Improve Road Safety PE in Hazardous Areas

See every Romania Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Romania Construction intelligence report in your inbox

A personalized report on Romania Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.