Romania – Hospital facilities construction work – Proiectare, execuţie lucrări și asistenţă tehnică din partea proiectantului pentru obiectivul de investitii: “Amenajare centru de cercetare producție ATMP Hub Terapie celulară avansată (Nextgen) Refuncționalizare clădire existentă corp C3 Institutul Clinic Fundeni”

Institutul Clinic Fundeni · Romania government procurement

Get new Romania Building Construction tenders by email, free: Set up alerts

Closed October 05, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$11.3M
Est. Value
Closed
Status

Opportunity Overview

Proiectare, execuţie lucrări și asistenţă tehnică din partea proiectantului pentru obiectivul de investitii: “Amenajare centru de cercetare producție ATMP Hub Terapie celulară avansată (Nextgen) Refuncționalizare clădire existentă corp C3 Institutul Clinic Fundeni”. Contractul are ca obiect proiectarea (faza DTAC, DTOE, PT+DDE), execuția lucrărilor de construire/amenajare și asistența tehnică din partea proiectantului pe perioada execuției, pentru [denumirea obiectivului], inclusiv furnizarea, instalarea, punerea în funcțiune și testarea dotărilor și echipamentelor medicale necesare funcționării facilității conform cerințelor tehnice din Anexa 5 - Echipamente, respectiv: echipamente de stocare criogenică (tanc criogenic, recipient exterior LN₂ cu instalație de distribuție), sisteme de siguranță și monitorizare a incintei (ventilație asistată, stingere incendii, monitorizare temperatură/umiditate, supraveghere video), echipamente de procesare și control al calității produselor de terapie celulară (sistem de procesare celule, centrifuge, hotă cu flux laminar, incubator, congelatoare -30°C/-80°C, frigider, nișă chimică), precum și echipamente de testare microbiologică și control (sistem detectare bacterii/fungi, termociclor PCR, toxinometru).” Durata de realizare a contractului este de 19 luni (570 zile) si cuprinde: * proiectare: 4 luni (120 zile); * executie: 16 luni (480 zile); Durata totala a contractului P+E este de 19 luni (570 zile), avand in vedere faptul ca o perioada de 1 luna (30 zile) din etapa de proiectare se suprapune cu etapa de executie. Prestarea serviciilor de proiectare se va realiza pe o durata de 4 luni (120 zile) de la data de incepere, notificata prin Ordinul Administrativ de Incepere a Serviciilor de Proiectare. Se precizeaza ca, in ultima luna (30 zile) a etapei de proiectare, vor putea fi demarate lucrarile de executie pentru acele categorii de lucrari care dispun de documentatie tehnica finalizata si avizata, asigurand astfel continuitatea...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyInstitutul Clinic Fundeni
CountryRomania
CategoryBuilding Construction
Estimated value$11.3M
PublishedSeptember 17, 2026
Procurement stageSolicitation
ClosedOctober 05, 2026
StatusClosed — no longer accepting responses
Original languageRomanian — members read it in their own language
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 23, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Romania

Romania – Railway construction works – “Rehabilitation of the Roman - Iași - Border railway line” - Phase 1. Electrification of the Iași - Border line (design and execution)
Romania – Road construction works – Execution of works: MODERNIZATION, REHABILITATION AND EXTENSION OF THE AZUGA - BUŞTENI - GURA VITIOAREI ROUTE, BY ACCESSING THE ALPINE GAP OF MUNŢII BAIULUI AND THE COUNTY ROADS DJ 102I, DJ 101T, DJ 102, DJ 100G - SECTION 1 GURA VITIOAREI – VALEA DOFTANEI
Romania – Construction work for highways – Execution of works for the “Modernization of DN 56C km 0+000 – km 60+375” project
Romania – Road bridge construction work – Design and Construction of a DN 24B Pipe Crossing at KM 42+092 over the Prut River, Albița‑Leușeni, Vaslui County
Romania – Construction work for school buildings – Execution of works for the realization of the objective: 'Construction of buildings with high school function, sports facilities, dormitory, canteen, conference spaces, related spaces, enclosure arrangement and fencing – Gheorghe Airinei Technical College of Post and Telecommunications', financed through the National Investment Program 'Safe and Healthy Schools'

See every Romania Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Romania Building Construction intelligence report in your inbox

A personalized report on Romania Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.