Construction work for the investment project: “Improving traffic flow PRIN measures for sustainable urban mobility – construction of the CU ROL corridor VERDE mobility PE on the SUD-VEST side of the municipality ALBA IULIA” – code SMIS: 349615, funded PRIN by the “Central Region” program 2021–2027

Original title (Romanian): Romania – Road construction works – Lucrari de executie pentru obiectivul de investiții: „FLUIDIZAREA TRAFICULUI RUTIER PRIN MĂSURI DE MOBILITATE URBANĂ DURABILĂ – CONSTRUIRE ARTERĂ CU ROL DE CULOAR VERDE DE MOBILITATE PE LATURA DE SUD-VEST A MUNICIPIULUI ALBA IULIA” - Cod SMIS: 349615 finanţat prin PROGRAMUL “REGIUNEA CENTRU” 2021 – 2027 Title machine-translated by GlobalGov; the original notice is authoritative.

Municipiul Alba Iulia · Romania government procurement

Get new Romania Building Construction tenders by email, free: Set up alerts

Closed October 06, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$19.9M
Est. Value
Closed
Status

Opportunity Overview

Proiectul urmărește realizarea unui coridor rutier în zona sud-vestică a municipiului Alba Iulia, care să asigure conectarea Bulevardului Revoluției și a străzii Ion Lăncrănjan cu Bulevardul Ferdinand I și Șoseaua de Centură. Obiectivul principal îl reprezintă devierea traficului din zona urbană spre periferie și închiderea inelului de centură al municipiului. Prezenta achiziție publică are ca obiect execuția lucrărilor pentru realizarea coridorului de mobilitate, pe baza proiectului tehnic pus la dispoziție de autoritatea contractantă, precum și proiectarea și execuția lucrărilor rezultate din studiul de coexistență, LOTUL 1 cuprinde realizarea unei străzi de categoria a II-a, cu o lungime de 2,3 km și o viteză de proiectare de 50–60 km/h. Profilul stradal include:• patru benzi de circulație, câte două pe sens; • benzi dedicate transportului public; • trotuare pe ambele părți; • piste pentru biciclete cu sens unic; • aliniamente de spații verzi; • șase stații de autobuz. Principalele suprafețe și lungimi prevăzute sunt: 20.699 mp de carosabil, 15.422 mp de benzi dedicate transportului public, 4.700 m de piste pentru biciclete, 11.723 mp de trotuare și 12.224,66 mp de spații verzi. Traseul traversează străzile Brândușei și Orlea prin două pasaje supraterane, amplasate la km 0+575 și km 0+835. Primul pasaj asigură o înălțime liberă minimă de 5,50 m, iar cel de-al doilea o înălțime liberă cuprinsă între 4,20 și 4,50 m, cu posibilitatea adaptării ulterioare în cadrul lucrărilor de modernizare a străzii Orlea. Proiectul include lucrări de siguranță rutieră și de colectare și evacuare a apelor pluviale, respectiv: • montarea a 201 indicatoare rutiere; • realizarea marcajelor longitudinale și transversale; • realizarea marcajelor pentru trecerile de pietoni; • amenajarea trecerilor de pietoni pe fundal roșu antiderapant; • marcarea cu verde a zonelor în care pistele pentru biciclete traversează partea carosabilă; • realizarea marcajelor rezonatoare în apropierea sensului...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyMunicipiul Alba Iulia
CountryRomania
CategoryBuilding Construction
Estimated value$19.9M
PublishedAugust 25, 2026
Procurement stageRequest for Proposal (RFP)
ClosedOctober 06, 2026
StatusClosed — no longer accepting responses
Original languageRomanian — members read it in their own language
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 25, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Romania

Romania – Hospital facilities construction work – Design, construction and equipment services for the Buftea Obstetrics‑Gynecology Hospital project, including demolition of existing buildings (C1‑C15), relocation of oxygen station and water utilities
Romania – Railway construction works – “Rehabilitation of the Roman - Iași - Border railway line” - Phase 1. Electrification of the Iași - Border line (design and execution)
Romania – Railway construction works – "Rehabilitation of the Roman - Iași - Border railway line" - Phase 1. Electrification of the Iași - Border line (design and execution)
Romania – Construction work for highways – Execution of works for the “Modernization of DN 56C km 0+000 – km 60+375” project
Romania – Road bridge construction work – Design and Construction of a DN 24B Pipe Crossing at KM 42+092 over the Prut River, Albița‑Leușeni, Vaslui County

See every Romania Building Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Romania Building Construction intelligence report in your inbox

A personalized report on Romania Building Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.