DESIGN SI Construction: Feleac Transregional Road TR 35 – Phase I of the Metropolitan Beltway TR 35 and Connecting Roads – Phase I of the Metropolitan Beltway TR 35 and Connecting Roads, Lot V

Original title (Romanian): Romania – Road construction works – PROIECTARE SI EXECUȚIE LUCRĂRI: Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot V

Municipiul Cluj-napoca · Romania government procurement

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$107.5M
Est. Value
September 09, 2026
Response Due
Active
Status

Opportunity Overview

PROIECTARE SI EXECUȚIE LUCRĂRI: „Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot V: drumul TR35 între km 28+600 și km 31+700 , incluzând Nodul 14 (Sopor), nodul 15 (Selgros) și parțial drumul de legătură DL B6( de la nod 14-[Sopor] până km 1+600)” conform documentatiei tehnice atasate; In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016 cu modificările si completările ulterioare, autoritatea stabileste ca orice operator economic interesat de participarea la procedura de achizitie publica are dreptul de a solicita clarificări sau informaţii suplimentare in legătură cu Documentaţia de atribuire - cu 20 de zile anterior termenului limita depunere oferte, la care se va raspunde cu 11 zile anterior termenului limita de depunere oferte. În valoarea estimata au fost incluse sume provizionate aferente Rezervelor de implementare astfel cum acestea sunt definite în clauzele generale aprobate prin HG nr. 1/2018, cu modificările și completările ulterioare, respectiv art.13 din Instrucțiunea ANAP nr. 1/2021 și nu valoarea cheltuielilor ‘diverse și neprevăzute’. Durata contractului, de la pct. II.2.7, este de 48 luni si se imparte in: 17 luni - proiectare si 31 luni - executie.

This is one of 477 active Romania Construction opportunities most of your competitors will never see.

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencyMunicipiul Cluj-napoca
CountryRomania
CategoryConstruction
Estimated value$107.5M
PublishedAugust 17, 2026
Procurement stageRequest for Proposal (RFP)
Response dueSeptember 09, 2026
StatusOpen — accepting responses
TranslationTranslated from Romanian by GlobalGov’s translation pipeline
Official sourceView original notice
Last verifiedAugust 26, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Related Opportunities in Romania

"SI Design and Construction: “Transregional Road Feleac TR 35 – Phase I: Metropolitan Beltway TR 35 and Connecting Roads – Phase I: Metropolitan Beltway TR 35 and Connecting Roads, Lot 3: TR35 Road between km 19+600 and km 24+365, including Interchange 8-(Basarabiei), Interchange 9 (Frunzișului), with Tunnels 1, 2, and 3, and the connecting road DL B8 (TR 35 Interchange 9 – Frunzișului Street in the city of Cluj-Napoca)
DESIGNSI; construction: “Transregional Road Feleac TR 35 – Phase I: Metropolitan Beltway TR 35 and Connecting Roads – Phase I: Metropolitan Beltway TR 35 and Connecting Roads, Lot IV
DESIGN SI Construction: “Feleac–TR35 Transregional Road – Phase I of the Metropolitan Beltway TR35 and Connecting Roads – Phase I of the Metropolitan Beltway TR35 and Connecting Roads, Lot IV
Delegation of the management of public street cleaning and snow removal services in the municipality of Cluj-Napoca, Sector II
Delegation of the management of the public street cleaning and snow removal service in the municipality of Cluj-Napoca, Sector II
SI DESIGN AND CONSTRUCTION OF THE “Craiova–Filiasi HighwaySIFiliasi–Târgu Jiu Expressway—Section 4”
SI DESIGN AND CONSTRUCTION OF THE “Craiova–Filiasi HighwaySIFiliasi–Târgu Jiu Expressway—Section 4”
Delegation, through a concession, of the management of certain waste management activities in Sector 2 of the Municipality of Bucharest

See every Romania Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Romania Construction intelligence report in your inbox

A personalized report on Romania Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.