DESIGN SI Construction: “Feleac–TR35 Transregional Road – Phase I of the Metropolitan Beltway TR35 and Connecting Roads – Phase I of the Metropolitan Beltway TR35 and Connecting Roads, Lot IV
Original title (Romanian): Romania – Road construction works – PROIECTARE SI EXECUȚIE LUCRĂRI: „Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot IV
Municipiul Cluj-napoca · Romania government procurement
GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.
September 10, 2026
Response Due
PROIECTARE SI EXECUȚIE LUCRĂRI: „Drum TransRegio Feleac TR 35 – Etapa I Centura Metropolitană TR 35 și Drumuri de Legătură – Faza I Centura Metropolitană TR 35 şi Drumuri de legătură, Lot IV: drumul TR35 între km 24+365 și km 28+600, incluzând Nodul 10-(Calea Turzii), Nodul 11 (Mihai Românul) , Nodul 12- (Măcieșului) , Nodul 13 (spital Pediatric ), inclusiv drumul de legătură DL B5- deviere Calea Turzii, spațiul de parcare de la km 25+720 și Centrul de Întreținere și Coordonare de la km 24+500” conform documentatiei tehnice atasate; In conformitate cu prevederile art. 160 alin. (1) din Legea nr. 98/2016 cu modificările si completările ulterioare, autoritatea stabileste ca orice operator economic interesat de participarea la procedura de achizitie publica are dreptul de a solicita clarificări sau informaţii suplimentare in legătură cu Documentaţia de atribuire - cu 20 de zile anterior termenului limita depunere oferte, la care se va raspunde cu 11 zile anterior termenului limita de depunere oferte. În valoarea estimata au fost incluse sume provizionate aferente Rezervelor de implementare astfel cum acestea sunt definite în clauzele generale aprobate prin HG nr. 1/2018, cu modificările și completările ulterioare, respectiv art.13 din Instrucțiunea ANAP nr. 1/2021 și nu valoarea cheltuielilor ‘diverse și neprevăzute’. Durata contractului, de la pct. II.2.7, este de 48 luni si se imparte in: 17 luni - proiectare si 31 luni - executie.
This is one of 477 active Romania Construction opportunities most of your competitors will never see.
Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | Municipiul Cluj-napoca |
|---|
| Country | Romania |
|---|
| Category | Construction |
|---|
| Estimated value | $195.3M |
|---|
| Published | August 17, 2026 |
|---|
| Procurement stage | Request for Proposal (RFP) |
|---|
| Response due | September 10, 2026 |
|---|
| Status | Open — accepting responses |
|---|
| Translation | Translated from Romanian by GlobalGov’s translation pipeline |
|---|
| Official source | View original notice |
|---|
| Last verified | August 26, 2026 |
|---|
Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.
See every Romania Construction opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Romania Construction intelligence report in your inbox
A personalized report on Romania Construction opportunities, emailed in 5-10 minutes. One per month, no account needed.