Romania – Road-repair works – Bituminous Pavements – Framework Agreement – 4 Years

Original title (Romanian): Romania – Road-repair works – Covoare bituminoase – Acord cadru - 4 ani. Title machine-translated by GlobalGov; the original notice is authoritative.

Consiliul Judetean Arad · Romania government procurement

Get new Romania Construction tenders by email, free: Set up alerts

GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$24.0M
Est. Value
December 16, 2026
Response Due
Active
Status

Want more tenders like this one?

We will email you a free list of open Construction tenders in Romania, usually within 10 minutes. No account needed.

Opportunity Overview

Acest tip de intervenție este necesar pentru limitarea degradărilor îmbrăcăminții rutiere, prevenirea infiltrațiilor de apă și menținerea capacității portante a drumului. Executarea la timp a covoarelor bituminoase contribuie la prelungirea duratei de exploatare, reducerea costurilor viitoare de reparații și îmbunătățirea siguranței și confortului participanților la trafic Lucrările contribuie la realizarea îndeplinirii sarcinilor specifice ale Autorității Contractante și se va realiza prin publicare de anunț. Executarea lucrărilor de covoare bituminoase pe drumurile județene este necesară pentru menținerea stării tehnice corespunzătoare a carosabilului, prevenirea degradărilor și creșterea siguranței circulației. Aceste lucrări nu pot fi realizate din resurse proprii, deoarece necesită stații de preparare a mixturilor asfaltice, utilaje specializate de așternere și compactare, echipamente pentru reciclare la rece cu stație mobilă, materiale conforme și personal calificat, resurse de care instituția nu dispune. În consecință, achiziția este justificată prin necesitatea întreținerii eficiente a rețelei de drumuri județene, prelungirii duratei de exploatare și utilizării eficiente a fondurilor publice. Valoarea estimată calculată a fost stabilită, după cum urmează: Acord Cadru minim 6.073.376,57 lei fără TVA și Acord Cadru maxim 109.149.813,31 lei fără TVA; Contract Subsecvent minim 1.494.795,27 lei fără TVA și Contract Subsecvent maxim 11.338.058,31 lei fără TVA. Informatiile referitoare la cantitățile estimate minime și maxime ale acordului cadru, precum și ale unui contract subsecvent minim/maxim, se regăsesc în secțiunea Documente, menționate în fișierul "Lista cantități fără valori. pdf". Durata unui contract subsecvent: 150 de zile de la data prevăzută în Ordinul de începere. Se pot încheia maxim 3 contracte subsecvente pe an, respectiv minim 1 contract subsecvent pe an.

Tenders like this are published on a national procurement portal that most bidders outside Romania never check.

How to bid: GlobalGov tracks this tender; it does not accept bids. Submit your response through the issuing agency’s official notice.

Bidding on this? Book 15 minutes with us and we will pull the documents, past awards and a translation for this tender live with you. Book a walkthrough

Your competitors are watching the same crowded contracts everyone else is. Track this opportunity and every one like it worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, cancel anytime.

Start a free GlobalGov account

Solicitation Details

Issuing agencyConsiliul Judetean Arad
CountryRomania
CategoryConstruction
Estimated value$24.0M
CPV45233142
PublishedNovember 11, 2026
Procurement stageRequest for Proposal (RFP)
Response dueDecember 16, 2026
StatusOpen — accepting responses
Original languageRomanian — members read it in their own language
Official sourceView original notice Track this tender · Get the tender pack: $49, delivered within 24h
Last verifiedNovember 23, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

More Opportunities in Romania

Romania – Railway construction works – Maintenance works by replacing elements of the road superstructure in sequence - 7 lots
Romania – Railway construction works – Maintenance Works: Sequential Replacement of Bridge Superstructure Components – 7 Lots
Romania – Roadworks – Modernization and Rehabilitation of Road Infrastructure, Public Lighting System, and Urban Furniture in Bucharest
Romania – Roadworks – MODERNIZARE ȘI REABILITARE A INFRASTRUCTURII STRADALE, A SISTEMULUI DE ILUMINAT PUBLIC ȘI A MOBILIERULUI URBAN ÎN MUNICIPIUL BUCUREȘTI
Romania – Construction work for highways, roads – PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Romania – Construction work for highways, roads – Design and construction – Craiova–Filiași Highway and Filiași–Târgu Jiu Expressway, Lot 4
Romania – Refuse and waste related services – Concession delegation for management of sanitation services in Sector 2, Bucharest
Romania – Tramway passenger coaches – Procurement of 79 new 36‑m trams for the Bucharest public tram modernization and Ghencea Extension network projects

See every Romania Construction opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →