Romania – Thermal insulation work – Increasing energy performance of residential blocks in the city of Simeria, LOT IV

Original title (Romanian): Romania – Thermal insulation work – ”Creșterea performanței energetice a blocurilor de locuințe din orașul Simeria, LOT IV”, Title machine-translated by GlobalGov; the original notice is authoritative.

Orasul Simeria · Romania government procurement

Get new Romania Energy tenders by email, free: Set up alerts

Closed November 18, 2026. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$3.9M
Est. Value
Closed
Status

Opportunity Overview

Under this procurement procedure, the contracting authority wishes to conclude a works contract for the execution of works under the project “Improving the energy performance of apartment blocks in the town of Simeria Lot IV”, comprising the following blocks: - Str. Piata Unirii, bl. 18 - Str. Piata Unirii, bl 20 - Str. Piata Unirii, bl 21 - Str. Teilor, bl 19 The works contract covered by this award procedure comprises energy renovation works for the multi-apartment residential buildings in the town of Simeria listed above. The public contract term will be a maximum of 8 months. Within this period, all works required for the energy renovation of the above-listed multi-apartment residential buildings in the town of Simeria, which are the subject of this procedure, will be carried out. The public works contract raises no particular issues during implementation. Given that, according to the technical design, energy efficiency works are to be carried out on 4 blocks, and the execution period is a maximum of 8 months, including the cold period during which works cannot be carried out, the works will be performed in parallel on at least 3 blocks at a time. The works covered by this contract consist of carrying out all works required to complete the investment objective in accordance with the technical design, detailed execution drawings, discipline-specific specifications, bills of quantities, plans and other project documents. The contractor is required to complete the works in their entirety, including the main works and the secondary, related and ancillary works necessary to ensure complete execution that is technically and functionally appropriate and to put the objective into operation. The works will be carried out in compliance with the technical solutions set out in the technical design, the detailed execution drawings, codes, standards, technical regulations and applicable legislation, as well as manufacturers’ instructions for the materials, products and...

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyOrasul Simeria
CountryRomania
CategoryEnergy
Estimated value$3.9M
CPV45321000
PublishedOctober 26, 2026
Procurement stageRequest for Proposal (RFP)
ClosedNovember 18, 2026
StatusClosed — no longer accepting responses
Original languageRomanian — members read it in their own language
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 27, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Romania

Romania – Services incidental to gas extraction – Products and services for well equipment for the prevention of sand inflows
Romania – Services incidental to gas extraction – Products and services for well equipment for the prevention of sand floods
Romania – Electricity – Electricity purchase for consumption points of Târgoviște Dâmbovița Water Company
Romania – Thermal insulation work – "Increasing the energy performance of residential blocks in the city of Simeria, LOT III"
Romania – Electricity – Supply of electrical energy for Sibiu municipality and Paltinis resort for 12 months, period 20.04.2027 – 19.04.2028

See every Romania Energy opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Romania Energy intelligence report in your inbox

A personalized report on Romania Energy opportunities, emailed in 5-10 minutes. One per month, no account needed.