Santa Cruz Road Corridor Connector Project (san Ignacio - San Jose)

World Bank – IBRD · Plurinational State of Bolivia government procurement

Bidding on World Bank-funded work in Plurinational State of Bolivia? Get new Roads and Highways Infrastructure tenders there by email, free: Set up alerts

This opportunity is now closed. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

The objective of the Santa Cruz Road Corridor Connector Project is to improve transport accessibility along the road corridor between San Ignacio de Velasco and San Jose de Chiquitos. There are two components to the project, the first component being road upgrading. The component will cover cost of feasibility and technical design remaining for one bypass, civil works, estimated cost of price adjustments and variations, supervision, and technical audits, if required. Further, the component will provide support (through the provision of small works, goods, training, and technical assistance, as the case may be) for the implementation and supervision of the Environmental Impact Assessment (EIA)/Environmental Management Plan (EMP), the Resettlement Action Plan (RAP), the Resettlement Policy Framework (RPF), and the Indigenous Peoples Plan (IPP). The second component is the technical studies and project management. This component links with the main investment by financing preparatory activities for upgrading the roughly 300 km San Matias-San Ignacio de Velasco road bi-oceanic corridor connecting with Brazil (northern corridor), including the preparation of relevant feasibility studies (including technical, economic, environmental, and social aspects) and bidding documents, excluding from the project the upgrading works of the selected road segments. That northern corridor and the investment under Component A form a contiguous stretch of road, more than 500 km in length. ABC has decided that the studies will envision investment under a PBC methodology through a 10-year DBMOT contracting approach. In addition, the component will finance relevant gender studies and PSIAs. Also supported will be provision of support for monitoring and evaluation (M&E) of the project including, among others: (a) the carrying out of the project audits; and (b) the carrying out of capacity-building activities on, among others, road asset management.

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyWorld Bank – IBRD
CountryPlurinational State of Bolivia
CategoryRoads and Highways Infrastructure
PublishedJanuary 11, 2017
Procurement stageSolicitation
ClosedClosing date not published
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 22, 2026

Source: The World Bank — Open Data, licensed CC BY 4.0.

More Open Opportunities in Plurinational State of Bolivia

ITB 132.2026 Procurement of Drip Irrigation Systems for Vegetables - RECEM Valles Project
Rehabilitation of 20 departments

See every Plurinational State of Bolivia Roads and Highways Infrastructure opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Plurinational State of Bolivia Roads and Highways Infrastructure intelligence report in your inbox

A personalized report on Plurinational State of Bolivia Roads and Highways Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.