The objective of the Santa Cruz Road Corridor Connector Project is to improve transport accessibility along the road corridor between San Ignacio de Velasco and San Jose de Chiquitos. There are two components to the project, the first component being road upgrading. The component will cover cost of feasibility and technical design remaining for one bypass, civil works, estimated cost of price adjustments and variations, supervision, and technical audits, if required. Further, the component will provide support (through the provision of small works, goods, training, and technical assistance, as the case may be) for the implementation and supervision of the Environmental Impact Assessment (EIA)/Environmental Management Plan (EMP), the Resettlement Action Plan (RAP), the Resettlement Policy Framework (RPF), and the Indigenous Peoples Plan (IPP). The second component is the technical studies and project management. This component links with the main investment by financing preparatory activities for upgrading the roughly 300 km San Matias-San Ignacio de Velasco road bi-oceanic corridor connecting with Brazil (northern corridor), including the preparation of relevant feasibility studies (including technical, economic, environmental, and social aspects) and bidding documents, excluding from the project the upgrading works of the selected road segments. That northern corridor and the investment under Component A form a contiguous stretch of road, more than 500 km in length. ABC has decided that the studies will envision investment under a PBC methodology through a 10-year DBMOT contracting approach. In addition, the component will finance relevant gender studies and PSIAs. Also supported will be provision of support for monitoring and evaluation (M&E) of the project including, among others: (a) the carrying out of the project audits; and (b) the carrying out of capacity-building activities on, among others, road asset management.
Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.
Start Free| Issuing agency | World Bank – IBRD |
|---|
| Country | Plurinational State of Bolivia |
|---|
| Category | Roads and Highways Infrastructure |
|---|
| Published | January 11, 2017 |
|---|
| Procurement stage | Active solicitation |
|---|
| Closed | January 11, 2017 |
|---|
| Status | Closed — no longer accepting responses |
|---|
| Official source | View original notice |
|---|
| Last verified | August 12, 2026 |
|---|
Source: The World Bank — Open Data, licensed CC BY 4.0.
See every Plurinational State of Bolivia Roads and Highways Infrastructure opportunity your competition is missing. Free for 14 days.
Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.
Start Free Trial — No Card RequiredFree 14-day trial · no card required
See who is already competing here →Used by capture teams who win by looking where the big players aren’t.
Get a free Plurinational State of Bolivia Roads and Highways Infrastructure intelligence report in your inbox
A personalized report on Plurinational State of Bolivia Roads and Highways Infrastructure opportunities, emailed in 5-10 minutes. One per month, no account needed.