Bulgaria – Construction work for water projects – ПАВЕЦ „ЧАИРА” – Подмяна на турбината и адаптиране към съществуващото оборудване, изпитвания и въвеждане в експлоатация на ХА4

International buyer · Bulgaria government procurement

Get new Bulgaria Water Supply Projects tenders by email, free: Set up alerts

Closed June 10, 2024. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

$29.4M
Est. Value
Closed
Status

Opportunity Overview

The order aims to replace the turbine of the existing hydro unit 4 (XA4), ensuring its adaptation to the other systems of the hydro unit and the PVPP, as well as to ensure participation in the primary and secondary regulation of the network frequency and the power supply of corridors for emergency restoration of the energy system. The scope includes design, manufacture, delivery of the equipment, dismantling of the existing and installation of the supplied new equipment, author's supervision, supervision, adjustment, testing and commissioning, personnel training and warranty service of all equipment specified below. The contractor shall supply all basic and auxiliary materials necessary for the dismantling and installation of the equipment and systems subject to the supply. The supplies will include: a new pump-turbine to replace the existing one on XA4, fully equipped with all necessary equipment and systems; general necessary auxiliary equipment and materials; spare parts for a 5-year operating period; special devices and tools necessary for dismantling, installation, maintenance and repair of the supplied equipment. The services subject to the order include the preparation of projects for the pump-turbine of XA4 and adaptation to existing systems, dismantling of existing building structures, facilities and systems, preparation of the installation site, construction and installation works of the supplied facilities and systems, repair works, author's supervision, supervision, adjustment, testing and commissioning, personnel training and elimination of defects during the warranty period. All projects prepared in the course of the execution of the order will become the property of the Contracting Authority. The technical requirements and conditions for the execution of the order are described in the Technical Specification.

This notice has closed, but buyers in this sector publish new ones every month. Save the search and get an alert, in your language, the day the next one opens. Free for 14 days, cancel anytime.

Start Free

Solicitation Details

Issuing agencyInternational buyer
CountryBulgaria
CategoryWater Supply Projects
Estimated value$29.4M
CPV45240000
PublishedMarch 07, 2024
Procurement stageSolicitation
ClosedJune 10, 2024
StatusClosed — no longer accepting responses
Official sourceView original notice · Get alerts for tenders like this
Last verifiedNovember 22, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

More Open Opportunities in Bulgaria

Bulgaria – Sewerage work – Implementation of investment projects on the sewer network, including reconstruction of parts of the water network within their scope within the territory of the Sofia Municipality
Bulgaria – Pharmaceutical products – Delivery of general hospital medicinal products for the needs of
Bulgaria – Disposable non-chemical medical consumables and haematological consumables – The dynamic purchasing system (esp) for delivery of medical devices for invasive procedures
Bulgaria – Pharmaceutical products – Delivery of medicinal products for SBALHZ EAD
Bulgaria – Telescopic sights – Delivery of optical instruments via framework agreements for three separate items

See every Bulgaria Water Supply Projects opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Your 14-Day Free Trial

Free 14-day trial · cancel anytime

See who is already competing here →

Get a free Bulgaria Water Supply Projects intelligence report in your inbox

A personalized report on Bulgaria Water Supply Projects opportunities, emailed in 5-10 minutes. One per month, no account needed.