Switzerland – Electricity distribution and control apparatus

Original title (Hungarian): Switzerland – Electricity distribution and control apparatus – Erneuerung der steuerungstechnischen Ausstattung des Kraftwerks Kappelerhof

SPC - Swiss Power Consulting GmbH · Switzerland government procurement

Closed April 28, 2025. GlobalGov surfaces government procurement from around the world, including the markets your competitors overlook.

Closed
Status

Opportunity Overview

Aufgrund des Alters der steuerungstechnischen Ausstattung des Kraftwerks Kappelerhof ist eine Erneuerung der Steuerung ab Sensorik bis zur seriellen Schnittstelle zur übergeordneten Leitstelle Kappelerhof notwendig. Die in den Ausschreibungsunterlagen beschriebenen Lieferungen und Leistungen umfassen die Auslegung, Berechnung, Konstruktion, Steuer- und Regelfunktionen, Bedienelemente, Fabrikation inklusive Prüfungen und Abnahmemessungen im Werk des Anbieters, den Transport zum Aufstellort, die Zwischenlagerung am Aufstellort, Demontage der vorhandenen Anlagen mit zugehörigen Provisorien, die Montage und Verkabelung, Inbetriebsetzung, Personalinstruktionen, Prüfungen und Abnahmemessungen im Kraftwerk, die Durchführung des Probebetriebes, Inspektionen während der Garantiezeit, Instruktionen und Schulungen des Kraftwerkpersonals sowie die Betriebsdokumentation inklusive der zugehörigen Konformitätserklärung für den Lieferumfang. English: Due to the age of the control systems equipment of the power plant Kappelerhof, it is necessary to renew the control system from the sensors to the serial interface to the higher-level network control system of the Kappelerhof power plant. The supplies and services include the design, calculation, construction, open-loop and closed-loop control functions, operating elements, fabrication including tests and acceptance measurements at the bidder's factory, transport to the installation site, interim storage at the installation site, dismantling of the existing equipment with associated temporary facilities, the assembly and cabling, commissioning, personnel instructions, tests and acceptance measurements at the power plant, the performance of trial operation, inspections during the warranty period, instructions and training of the power plant personnel as well as the operating documentation including the associated declaration of conformity for the scope of supply.

Your competitors are watching the same crowded contracts everyone else is. Track live opportunities like this one worldwide, set deadline alerts, and win where they aren’t. Free for 14 days, no card.

Start Free

Solicitation Details

Issuing agencySPC - Swiss Power Consulting GmbH
CountrySwitzerland
CategoryPower Transmission
CPV31200000
PublishedMarch 05, 2025
Procurement stageActive solicitation
ClosedApril 28, 2025
StatusClosed — no longer accepting responses
TranslationTranslated from Hungarian by GlobalGov’s translation pipeline
Official sourceView original notice
Last verifiedSeptember 20, 2026

Source: Tenders Electronic Daily (TED), © European Union. Notice content reused under Commission Decision 2011/833/EU; editorial content licensed CC BY 4.0. GlobalGov is not affiliated with the European Union.

Browse Similar Open Opportunities in Switzerland

Switzerland – Works for complete or part construction and civil engineering work
Switzerland – Radio, television, communication, telecommunication and related equipment
Switzerland – IT services: consulting, software development, Internet and support
Switzerland – IT services: consulting, software development, Internet and support
Switzerland – IT services: consulting, software development, Internet and support
Switzerland – Switch blades
Switzerland – Social work and related services
Switzerland – IT services: consulting, software development, Internet and support

See every Switzerland Power Transmission opportunity your competition is missing. Free for 14 days.

Get real-time alerts, competitive intelligence, and deadline tracking for this and every market worldwide.

Start Free Trial — No Card Required

Free 14-day trial · no card required

See who is already competing here →

Get a free Switzerland Power Transmission intelligence report in your inbox

A personalized report on Switzerland Power Transmission opportunities, emailed in 5-10 minutes. One per month, no account needed.